Topic | Recent |
---|---|
Wood fencing around the exterior of the buildingNC-2009 MRc7: Certified Woodposted by Lester Cox on Aug 23, 2010, 6:39 pm
Public Branch Library in Dallas, Texas - We want to utilize... Last reply: Doug Pierce, AIA, Aug 26, 2010, 10:17 am |
|
definition of "bus line" vs. "bus stop"CI-2009 SSc3.1: Alternative transportation - public transportation accessposted by Philip Herriges on Aug 23, 2010, 5:45 pm
I'm not sure that the graphic above for this credit for option #2 is correct. The credit reads for option 2: "Locate the project within 1/4 mile... Last reply: Simon Sue, Aug 25, 2010, 9:14 pm |
|
Space Usage TypesEBOM-2009 SSc1: LEED Certified Design and Constructionposted by Steve Offutt on Aug 11, 2010, 4:01 pm
I also wasn't sure where to ask this question. It might be worthwhile to have a general... Last reply: Jenny Carney, Aug 25, 2010, 6:19 pm |
|
Strategies to filter TSSNC-2009 SSc6.2: Stormwater design - quality controlposted by Habitech Distretto Tecnologico Trentino on Jul 30, 2010, 3:48 am
The project is located in Italy and the project team is able to treat the 90 % of the average annual rainfall using some systems in series. The water comes from the roofs and all the hardscape in... Last reply: Amy Rider, Aug 25, 2010, 1:59 pm |
|
Stormwater cisternNC-2009 SSc6.2: Stormwater design - quality controlposted by Jana Schulz on Jul 21, 2010, 1:14 pm
This is a project located in previously developed urban area. We have a cistern capable of receiving 100% of the site's runoff, however, only a small amount of this water will be reused in... Last reply: Amy Rider, Aug 25, 2010, 1:52 pm |
|
Re: Controllability Through a Web-based Interface and the BMSNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by James Del Monaco on Aug 25, 2010, 10:54 am
I understand the typical methods for achieving this credit, i.e., underfloor air, etc. And I have documented this on other project (under NC v2.2). But I have a project where the approach may... Last reply: Lauren Sparandara, Aug 25, 2010, 1:15 pm |
|
Non-occupied SpacesCI-2009 EAc1.3: Optimize energy performance - HVACposted by James Del Monaco on Aug 24, 2010, 6:42 pm
I'm working on a TI project where the tenant occupies 2 floors of an 8-story office building. I have an overhead... Last reply: Paul Conrad, Aug 25, 2010, 9:55 am |
|
M&V Plan- QuestionsCS-2009 EAc5.1: Measurement and verification - base buildingposted by Maya Karkour on Aug 25, 2010, 6:06 am
Dear all, I am attempting LEED 2009 CS, EA Cr 5.1 & Cr 5.2. My project is 4 multi-storey commercial buildings, whereby a different tenant occupies each floor of a building.... Last reply: Christopher Schaffner, Aug 25, 2010, 9:36 am |
|
Energy Star and Energy & Water Data Release FormEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Aug 9, 2010, 4:35 am
1) if a project obtains a score of 96 in Energy Star, this counts as 18 points? Last reply: Pablo Fortunato Suarez, Aug 24, 2010, 10:59 pm |
|
Interior Lighting- University Resident HousingNC-2009 SSc8: Light Pollution Reductionposted by Cynthia Estrada on Aug 24, 2010, 5:03 pm
Does anyone have experience with a campus dorm application for Interior Building Lighting - Option 2? I don't think the campus wants to pay for automatic shades for all the resident rooms, much... |