Topic | Recent |
---|---|
Achieving Brownfield Redevelopment credit without Phase II ESANC-2009 SSc3: Brownfield Redevelopmentposted by Waylon Lo on Jun 11, 2010, 3:06 pm
We are working on a major renovation of an existing office building built in 1951. A Phase I ESA study and sampling of suspectg asbestos-containing materials, lead-contatining paint, mold and... Last reply: Larry Sims, Jun 28, 2010, 3:26 am |
|
FTE calculations for Water Use Reduction and Bikes /ShowersSchools-2009 WEc3: Water Use Reductionposted by Joanna Jenkins on May 18, 2010, 8:57 am
We are working on a LEED for Schools 2007 version project. (Yes, I know I"m posting this under the LEED v2009 Schools, but there isn't a section of LEED USER which allows you to search on older... Last reply: Rick Gehrke, Jun 26, 2010, 1:58 pm |
|
Can Fire Station Doors be considered windowsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Michael Dudek on Jun 23, 2010, 3:33 pm
For IEQ2, in the fire truck bays,we have windows on the rear of the building and operable doors on the front. Can we count the doors as operable windows under "Natural Ventilated Spaces". Last reply: Lauren Sparandara, Jun 25, 2010, 4:47 pm |
|
IEQ8.1 New Construction 2009 using Option2 Prescriptive MethodNC-2009 IEQc8.1: Daylight and views - daylightposted by Kathleen Burke on Jun 2, 2010, 1:03 pm
I read the referrence guide and saw an example posted under documentation toolkit and neither really match with the form that is used for the credit. This form asks for number of zones, daylight... Last reply: Seema Pandya, Jun 25, 2010, 3:42 pm |
|
Pesticides not listed in 2007 San Francisco ListEBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Yong Lee Low on Jun 24, 2010, 4:30 am
Most of the chemicals being used for my project are not listed in the 2007 San Francisco Reduced-Risk Pesticide List.Does it mean that the credit cannot be achieved or if we are issuing the... Last reply: Shira Norman, Jun 25, 2010, 12:36 pm |
|
Prescriptive Method QuestionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Melissa Wrolstad on Sep 25, 2009, 9:59 am
1.) In the Sample Prescriptive Compliance Method and Plan document, it depicts a room divided up into 3 bays. What is the purpose of dividing the room into 3 bays? Wouldn't the results be the... Last reply: Seema Pandya, Jun 25, 2010, 11:33 am |
|
§ 6.4, Meet the requirements i ASHRAENC-2009 EAp2: Minimum Energy Performanceposted by Lisa Håkansson on Jun 21, 2010, 3:35 am
Hi! In the form for HVAC, part 2, § 6.4 system worksheet, contains the mandatory requirements for HVAC... Last reply: Christopher Schaffner, Jun 25, 2010, 10:21 am |
|
SSc1 Option 2 Paths as EP in IDc1CI-2009 IDc1: Innovation in Designposted by Victoria Lockhart on Jun 22, 2010, 1:37 pm
Can Paths from SSc1 of the LEED CI Rating System Option 2 that were not "cashed in" as part of SSc1 be pursued as EP in ID? In particular, Path 6 Light Pollution omits the requirements on... Last reply: Tristan Roberts, Jun 24, 2010, 11:21 pm |
|
Local Accredited LaboratoriesSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Carmelito Tatlonghari on Jun 12, 2010, 3:48 am
I am doing LEED Registered Projects in the Philippines. Last reply: Tristan Roberts, Jun 24, 2010, 11:15 pm |
|
Low emitting materials in CS 2.0CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by javier bolanos zeledon on Jun 24, 2010, 10:18 pm
Regarding low emitting materials such us solvents, adhesives, carpets, in CS2.0. Can I put just one compliant door for example and still get that credit. It is my understanding that CS 2.0 does... Last reply: Tristan Roberts, Jun 24, 2010, 10:41 pm |