Topic | Recent |
---|---|
Preventative Maintenance PlanEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Michelle Perez on Dec 9, 2010, 5:19 pm
I am attempting to compile the preventative maintenance plans for all of the major systems of my building, and was wondering exactly how in depth we are required to go? For example, what... Last reply: Dan Ackerstein, Dec 29, 2010, 1:41 pm |
|
One more question on Students...EBOM-2009 SSc4: Alternative Commuting Transportationposted by Scott Bowman on Dec 14, 2010, 5:23 pm
We have a campus college project with the majority of the college housed in one building. There are three different departments of this college in the building, so defining the staff and doing a... Last reply: Dan Ackerstein, Dec 29, 2010, 1:29 pm |
|
Multiple Units with Varying OSA RatesNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Patrick Farmer on Dec 28, 2010, 5:42 pm
Our project, as with most projects, has various air handling units with different OSA rates. To achieve the 14,000 cuft / sf, do we calculate the building as whole, or does each space have to... Last reply: Patrick Farmer, Dec 29, 2010, 12:50 pm |
|
Receiving Room DoorsSchools-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Laura Long on Dec 22, 2010, 10:38 am
Our LEED-Schools project has a Receiving Room with a roll-up door and a man door. Are the entryway systems required at both the roll-up and the man door? There is also a Receiving Office... Last reply: Allison Beer McKenzie, Dec 29, 2010, 11:46 am |
|
SPECIAL CIRCUMSTANCES?Living with LEED Online - quirks, bugs and hiccupsposted by Jean Marais on Sep 28, 2010, 5:53 am
Does anybody know how to specify SPECIAL CIRCUMSTANCES and uploads so that the "Compliance Documented:" box turns to Y? Last reply: Clint Newton, Dec 29, 2010, 8:40 am |
|
Completing OA table with correct Ev value.CI-2009 IEQp1: Minimum indoor air quality performanceposted by LarsonBinkley Employees on Nov 10, 2010, 11:03 am
ASHRAE 62's Ev value is determined by either the ASHRAE Standard 62 Appendix A (lowest calculated method value of the zone efficiency Evz) or per ASHRAE's Table 6-3 "System Ventilation Efficiency... Last reply: Tristan Roberts, Dec 29, 2010, 8:33 am |
|
Upload whole system manual?NC-2009 EAc3: Enhanced Commissioningposted by Jorng-ren Chern on Dec 29, 2010, 7:34 am
The EA C3 credit form require us to upload system manual. The project I am working is a large clean room project. The capacity of the HVAC system is huge and so are the system manuals. My... Last reply: Scott Bowman, Dec 29, 2010, 8:33 am |
|
VOC MethodologiesCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Carmelito Tatlonghari on Sep 8, 2010, 4:57 am
Which methodology for analyzing... Last reply: Reinhard Oppl, Dec 29, 2010, 7:51 am |
|
EMICODE Accepted by GBCI?NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Omer Moltay on Mar 29, 2010, 4:08 pm
What about European products for this credit? Most of them are certified by EMICODE (as ug/m3 limits), which is more stringent than US standards. Many projects outside the US have to use paints... Last reply: Reinhard Oppl, Dec 29, 2010, 7:37 am |
|
Applying ASHRAE 62.1 to an existing buildingNC-2009 IEQp1: Minimum indoor air quality performanceposted by Jennifer Wehling on Apr 8, 2010, 7:12 pm
We are doing a major renovation on an existing building. The project is seeking LEED NC certification and we are having trouble interpreting how the ASHREAE 62.1 standard needs to be applied to... Last reply: Tristan Roberts, Dec 28, 2010, 11:37 pm |