Topic | Recent |
---|---|
Portfolio Manager Solar DataEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Nell Boyle on Mar 9, 2011, 2:41 pm
We have a grid tied solar array that we regularly sell energy back to the utility. The LEED form clearly states that they are interesteded in all solar generated, which is 23.5 Mwh. However the... Last reply: Nell Boyle, Mar 11, 2011, 3:53 pm |
|
Design for the Environment logoEBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materialsposted by Geoffrey Tomlinson on Mar 6, 2011, 7:56 pm
Does a product with the EPA's Design for the Environment logo qualify for this credit? Last reply: Jenny Carney, Mar 11, 2011, 3:50 pm |
|
What About Multi-Family Residential Buildings?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Lance Collins on Feb 17, 2011, 8:00 pm
Multi-family residential buildings are currently not eligible to receive an Energy Star score in Portfolio manager. Also, they do not have data on national average EUI to use for comparison to... Last reply: Jenny Carney, Mar 11, 2011, 3:12 pm |
|
EAp2, Option 2EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by susan eguia on Feb 23, 2011, 2:41 pm
Hi, Last reply: Jenny Carney, Mar 11, 2011, 3:04 pm |
|
LEED for Schools 2007 EAc1 and LEED BoundarySchools-2009 EAc1: Optimize Energy Performanceposted by Greg Hackett on Feb 25, 2011, 4:11 pm
Our project contains a new LEED Building (addition) and Non-LEED Building (Existing, not in LEED Boundary). The school is looking into cross-tying the DDC controls (only) for the HVAC system for... Last reply: Tristan Roberts, Mar 11, 2011, 2:53 pm |
|
Calculation of GES equivalent to RECEBOM-2009 EAc6: Emissions Reduction Reportingposted by MAUDE PINTAL on Jan 18, 2011, 9:38 am
The... Last reply: Jenny Carney, Mar 11, 2011, 2:05 pm |
|
LocationSchools-2009 MRp1: Storage and Collection of Recyclablesposted by Eri Spaulding on Feb 28, 2011, 4:07 pm
Guidelines refer to a "dedicated recycling collection and storage area that is easily accessible whithin the building". I would imagine that most haulers would prefer to have this area located... Last reply: Lisa Fabula, Mar 11, 2011, 1:33 pm |
|
Shall canopies attched to building include in building footprintNC-2009 SSc5.1: Site development - protect or restore habitatposted by Na Xing on Mar 2, 2011, 3:15 am
Hi, Could anyboday help me. Last reply: David Posada, Mar 11, 2011, 12:43 pm |
|
WEp1- Handheld bidet faucetsCS-2009 WEp1: Water Use Reductionposted by Tapio Peltonen on Mar 10, 2011, 7:26 am
Every toilet stall in the project includes a handheld bidet faucet (or spray) and a lavatory. Are these calculated as lavatory faucets or ignored in the water use calculation? Last reply: Tapio Peltonen, Mar 11, 2011, 12:34 pm |
|
Deriving Minimum Efficiency Requirements for Baseline ChillersNC-2009 EAc1: Optimize Energy Performanceposted by heinrich post on Mar 11, 2011, 9:38 am
We are wondering how to interpret the Minimum Efficiency Tables of Chapter 6.8 in ASHRAE 90.1-2007 to model HVAC efficiencies of baseline equipment. Last reply: Marcus Sheffer, Mar 11, 2011, 11:57 am |