Log in
Forum
Topic

Preferred Parking

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Denise Shimabukuro on Aug 31, 2010, 8:01 pm

Our government job follows the design guidelines set forth in the United Facilities Criteria (UFC). The specific UFC that we are required to follow contains a minimum requirement for VIP parking...

Last reply: Ryan Gaylord, Sep 2, 2010, 1:04 pm

Hazardous Chemicals and Gases

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Rob Hink on Aug 31, 2010, 8:37 am

Is there a list or guidance on what is considered hazardous chemicals and gases?
Is the a volumn threshold for each type?
Examples:
Doctor's office sterilization room?
...

Last reply: Allison Beer McKenzie, Sep 2, 2010, 11:07 am

Door width larger than mat width

EBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source control
posted by Paul C on Sep 1, 2010, 2:34 pm

I know the mat width is not required to cover the doorway width, but I have a 6' wide double doorway and wanted to see if I could turn my exisitng 4'x6' mats both indoor and outdoor to be length...

Last reply: Tristan Roberts, Sep 2, 2010, 5:47 am

ISO14001 and EHSMS18001

EBOM-2009 IOc1: Innovation in Operations
posted by Pablo Fortunato Suarez on Sep 1, 2010, 5:41 am

The LEED Guidebook mentions environment management systems conforming to ISO 14001-2004 in the development of environmental policies and objectives as a possible path to an Innovations in...

Last reply: Tristan Roberts, Sep 2, 2010, 5:40 am

Pressure drop adjustments

NC-2009 EAp2: Minimum Energy Performance
posted by Gustav Alfaro on Aug 3, 2010, 5:37 pm

I have a question, for hotel buildings the baseline HVAC system type to be used should be PTAC/PTHP according to ASHRAE 90.1 (ductless).
This proposed building will be composed by a chilled...

Last reply: Gustav Alfaro, Sep 1, 2010, 6:32 pm

How exemplary do you have to be for Path 12?

CI-2009 SSc1: Site Selection
posted by Tristan Roberts on Dec 11, 2009, 2:34 pm

The LEED Reference Guide seems to give conflicting advice on how to pursue Path 12 of this credit.

On page 66, the basic description for Path 12 says that "the requirements of another LEED...

Last reply: Anthony Brower, Sep 1, 2010, 6:15 pm

CI V3- IEQp1 Uploads

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Malik Rehman on Aug 26, 2010, 8:52 pm

IEQp1 Upload # 6 - "Provide the regulatory approval letter or document indicating the engineered system has been approved by the authority having jurisdiction."

Will approved building...

Last reply: Malik Rehman, Sep 1, 2010, 5:14 pm

CI V3- IEQp1 Uploads

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Malik Rehman on Aug 26, 2010, 8:20 pm

IEQp1 Upload # 3 - "Provide a graphic and numeric summary of the airflow analysis performed. Include the boundary conditions used for the analysis; simulation algorithm; solution variables;...

Last reply: Malik Rehman, Sep 1, 2010, 5:13 pm

CO2 sensors in non-densely occupied spaces

CS-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Maya Karkour on Aug 11, 2010, 7:49 am

Hi there,

The design team of a project we are working on, would like to install CO2 sensors in every occupied area...

Last reply: Allison Zuchman, Sep 1, 2010, 4:29 pm

80% non-irrigated Native, 20% inefficient irrigation landscape

NC-2009 WEc1: Water Efficient Landscaping
posted by Eamon Geary on Sep 1, 2010, 1:36 pm

Our landscaped site is approximately 80% natively, non-irrigated vegetated. However, 20% of our site landscape is forced (due to owner requirements) to irrigate grass in a fairly in-efficient way...

Last reply: Tristan Roberts, Sep 1, 2010, 4:08 pm