PFc Occupant Experience SurveyGeneral forumsposted by Linda Smithe on Jan 14, 2011, 12:17 pm
Requirements referrers to Appendix A. Provide Appendix A in next round. Last reply: Aaron Desatnik, Jan 31, 2011, 8:08 pm |
|
Do reused Hospital beds qualify for furniture reuse credit?CI-2009 MRc3.2: Materials reuse - furniture and furnishingsposted by Bryan Waters on Jan 31, 2011, 2:10 pm
We would like to pursue this credit, as our hospital floor renovation project registered under LEED CI v 2.0 is reusing all patient beds. However, there is a concern that patient beds may not... Last reply: Dave Intner, Jan 31, 2011, 4:23 pm |
|
owner only recycles certain plastics and certain metalsCI-2009 MRp1: Storage and Collection of Recyclablesposted by Patricia Ewanski on Jan 28, 2011, 12:31 am
I have a project where the building owner recycles paper, plastic (i.e. plastic bottles only), cardboard (doesn't specify whether this means corrugated or not), and metal (aluminum cans only). If... Last reply: Patricia Ewanski, Jan 31, 2011, 3:44 pm |
|
Building shading to a courtyard acceptable?NC-2009 SSc7.1: Heat island effect - nonroofposted by R Jones on Jan 27, 2011, 6:37 am
I have a building which wraps a round a courtyard on 3 sides and on the fourth is an existing building - this building will be maintained, this is almost all the non... Last reply: Jacob Arlein, Jan 31, 2011, 12:49 pm |
|
CxA for Data Center that is only fully equiped partial floorNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Eric JS on Dec 16, 2010, 11:09 am
Hi all, would like to check if a data center project only install M&E equipment at 2 storeys out of 5 storeys within the first few years, will the... Last reply: Eric JS , Jan 31, 2011, 3:09 am |
|
UPS system need to be commissioned?NC-2009 EAc3: Enhanced Commissioningposted by Eric JS on Jan 30, 2011, 3:33 am
Hi all, UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power. In that case, do we include this in commisioning... Last reply: mike lackey, Jan 30, 2011, 3:09 pm |
|
Option 1-Pilot-Credits PC12: Reduced Automobile Dependenceposted by Habitech Distretto Tecnologico Trentino on Jan 21, 2011, 11:16 am
Hello, I am working on a LEED CI Project and I saw that it seems feasible to follow Option-1 “Transit-Served Location” for the project thanks to the location of the building. Before... Last reply: Habitech Distretto Tecnologico Trentino, Jan 29, 2011, 6:02 am |
|
refrigerant chargeEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Pablo Fortunato Suarez on Aug 15, 2010, 11:51 pm
Based on actual calculations of the refrigerant charge value (lb/ton) some of the values are higher than the "default maximum allowable equipment refrigerant charge" according to table 2 of the... Last reply: Pablo Fortunato Suarez, Jan 28, 2011, 6:12 am |
|
SS P1 outside of the United StatesNC-2009 SSp1: Construction Activity Pollution Preventionposted by Martin Meehan on Jan 25, 2011, 9:46 am
For a building starting construction in February 2011 do we follow the... Last reply: Lisa Marshall, Jan 27, 2011, 5:48 pm |
|
Ventilation Baseline and ProposedNC-2009 EAp2: Minimum Energy Performanceposted by Chris Mullinax on Jan 20, 2011, 12:22 pm
I am currently modeling a 51,000 sq.ft., two story building. The baseline HVAC system per ASHRAE Appendix G, is a type 5 (PVAV). The baseline model incorporates one PVAV per floor. The proposed... Last reply: Christopher Schaffner, Jan 27, 2011, 12:09 pm |