Water metering Strategy NarrativeNC-v4 WEc4: Water meteringposted by marty seese on Jul 28, 2022, 1:39 pm
Leed online indicates that the documentation needed is a water metering strategy narative. Is this like written text or do drawings work? Just wanting to provide the correct information. We have... Last reply: Olga Yuil, Jul 29, 2022, 10:46 am |
|
Greenhouse- Regularly Occupied?NC-v4 EQc5: Thermal comfortposted by Irene Chung on Jul 28, 2022, 10:02 am
I am working on a new university building project pursuing LEED v4 BD+C New Construction, and it includes a greenhouse. The greenhouse is a separate building from the main project building. ... Last reply: Emily Purcell, Jul 29, 2022, 9:15 am |
|
Irrigation for a Greenhouse?NC-v4 WEp1: Outdoor water use reductionposted by Irene Chung on Jul 28, 2022, 10:00 am
Does irrigation water use for plants in the greenhouse need to be included in the credit calculation? Last reply: Emily Purcell, Jul 29, 2022, 9:01 am |
|
Building Flush-Out InquiryNC-v4.1 EQc4: Indoor air quality assessmentposted by Bolaji Olanrewaju on Jul 28, 2022, 9:08 pm
I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g. office, lunch room... |
|
USGBC points Table for CalGreen projects for LEED v4 BD+C: NCIntro to CALGreen and LEEDposted by Saurabh Shrestha on May 7, 2018, 1:28 pm
Hi, I see there is a table published for points that can be achieved for the Optimize Energy Performance for LEED v4 BD+C: Homes based on the Title 24 2016 energy model. I cannot find one... Last reply: Jay Hindmarsh, Jul 28, 2022, 4:52 pm |
|
Target Finder outside the US- For Credit NC-v4 EAc2- Optimize energy performanceNC-v4 EAc2: Optimize Energy Performanceposted by Worood Shbeikat on Jul 27, 2022, 6:25 am
Hi, Is it true that a project outside the US (located in Europe) does not necessarily have the target finder results for Minimum energy performance and Optimized energy performance? I saw in the... Last reply: Marcus Sheffer, Jul 28, 2022, 1:59 pm |
|
WEpc115 Rainwater capturePilot-Credits WEpc115: Whole Project Water Use Reductionposted by Aliesa Adelman on Jul 28, 2022, 1:11 pm
Our project takes into account a... |
|
Terrace PlantersCS-v4.1 SSc2: Protect or Restore Habitatposted by Bret Mantyk on Jul 28, 2022, 12:14 pm
I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit... |
|
Default Gravel SRI ValuesNC-2009 SSc7.2: Heat island effect - roofposted by Annalise Reichert on Jan 20, 2015, 1:58 pm
I am also working on a project that has a large green roof with light colored gravel in some areas. The manufacturer has not performed testing to provide an... Last reply: Erin Holdenried, Jul 28, 2022, 9:08 am |
|
LEED boundary- disturbed land that will support more than the projectNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Kimberly Reddin on Jul 25, 2022, 11:11 am
Hi, I am working on an addition to a large existing building on a large parcel of land that the client owns. The masterplan for this site includes several future projects that could happen... Last reply: Kimberly Reddin, Jul 28, 2022, 9:08 am |