What suggestions are there for the case of moisture damage from rain?NC-v4 EQc3: Construction indoor air quality management planposted by Karen Shilo on Jan 3, 2023, 12:30 pm
Is it possible to utilize heating systems during new construction in order to dry out some moisture damage from rain prior to construction completion? Filters would be used to maintain indoor air... Last reply: Karen Shilo, Jan 3, 2023, 12:33 pm |
|
Air Sampling High Rises for RecertificationEBOM-v4.1 EAp2: Fundamental Refrigerant Managementposted by Karen Shilo on Jan 3, 2023, 11:32 am
What is the best way to air sample in the most efficient and cost effective way for a residential high rise for recertification? Our team has been able to identify each of the heating and cooling... |
|
Tenant IT equipmentCS-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Dec 20, 2022, 10:19 am
Hello, I have a question regarding LEED v4 Core & Shell, EA P2 - Minimum energy performance. We’re currently involved in several LEED Core & Shell Certifications of... Last reply: Marcus Sheffer, Dec 30, 2022, 10:52 am |
|
Waste Oil as renewable energyNC-v4.1 EAc5: Renewable energyposted by Vitor Leite Goncalves on Dec 22, 2022, 3:17 pm
Dear all, One of our projects is a car dealership that is planning to re-utilize all waste oil generated onsite as space heating. Can this system be applied as... Last reply: Marcus Sheffer, Dec 30, 2022, 10:47 am |
|
Daylight option 2 Area of Interest (AOI)NC-v4 EQc7: Daylightposted by Elena Marku on Dec 29, 2022, 10:17 pm
Hi, Could you please guide me with the following: |
|
Question regarding Occupancy sensorNC-v4 EAp1: Fundamental commissioning and verificationposted by Nagaraj Sankar on Dec 29, 2022, 6:47 am
How can we show and prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on our drawings ? kindly... |
|
Commingled Waste v4 DocumentationNC-v4 MRc5: Construction and demolition waste managementposted by Samantha Lee on Apr 7, 2020, 4:58 pm
What is required to be submitted for... Last reply: Michelle Rosenberger, Dec 27, 2022, 11:13 am |
|
Documentation for Project-Specific Recycling of Commingled WasteNC-v4 MRc5: Construction and demolition waste managementposted by Erica Downs on Oct 21, 2020, 2:51 pm
All the guidance I can find says to "provide documentation of project-specific rates" or the facility's annual average rate. I cannot find info on what kind of documenation would be required for... Last reply: Michelle Rosenberger, Dec 25, 2022, 11:48 am |
|
exhaust fan/fume hoodSchools-NC-v4 EQp3: Minimum acoustic performanceposted by Kai Starn on Aug 2, 2022, 7:39 pm
Hi, working on a new school k-12 project with a chemistry lab. Does the 40... Last reply: , Dec 23, 2022, 2:40 pm |
|
LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?NC-v4 EQc2: Low-emitting materialsposted by Summer Gorder on Dec 22, 2022, 6:41 pm
We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up. Some are having to go there superiors to get it... |