Log in
Forum
Topic

Occupant Load & Usage Question

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Jan 27, 2023, 11:43 am

Where does the project Occupant Load and Usage info get logged/docuemnted for the entire project?

The WEc2 calculator includes areas where this infor needs be added, but this this...

Last reply: emily reese moody, Jan 27, 2023, 11:50 am

Refrigerants: Heat-pump out of leed boundady

CS-v4 EAc6: Enhanced Refrigerant Management
posted by D M on Jan 27, 2023, 6:50 am

Hi,

i checking a building that has the main heat pump out of leed boundary, it is in common with other 2 buildings (not leed certified).

Should I to consider this heat pump for...

Different strategies in different rooms

NC-v4.1 EQc6: Interior lighting
posted by An Marc on Sep 21, 2021, 4:04 am

Our project (NCv4.1) consists of production area (regulary occupied) and office area.

Can we applay strategies 1(Glare Control),2(Color Rendering),3(Lighting Control) for production area...

Last reply: Emily Purcell, Jan 26, 2023, 3:57 pm

External insulation to be compliant?

CS-v4.1 EQc2: Low-emitting materials
posted by Norbert Szircsak on May 19, 2021, 5:17 am

Dear All,

While the credit description starts with "use materials on the...

Last reply: Maria Porter, Jan 26, 2023, 7:02 am

Prime farmland evaluation?

NC-v4 SSc1: Site assessment
posted by Nate Tsang on Jul 5, 2016, 10:18 pm

Does anyone have experience doing a soil survey to determine whether the site was on...

Last reply: Adrian N. Lopez, Jan 25, 2023, 1:26 pm

Desk Fan Fire Safety

NC-v4 EQc5: Thermal comfort
posted by Jason Cocek on Jan 25, 2023, 12:11 pm

Has anyone run into the issue of fire marshall not allowing desk fans due to potential fire hazard? If so, what was the solution?

Last reply: Dave Hubka, Jan 25, 2023, 12:20 pm

Redirecting rainwater to bodies of water outside the project site?

NC-v4 SSc4: Rainwater management
posted by LEED Pro Consultant on Jan 23, 2023, 4:57 pm

Hi everyone,

Does redirecting rainwater to bodies of water outside the project site count as low-impact development (...

Last reply: Gustavo De las Heras Izquierdo, Jan 23, 2023, 5:21 pm

Deadline for hiring CxA

NC-v4 EAc1: Enhanced Commissioning
posted by Elizabeth Powers on Jan 24, 2017, 1:16 pm

Does anyone know if there is a deadline for hiring the...

Last reply: Dave Hubka, Jan 23, 2023, 1:27 pm

4.1 calculators

CI-v4.1 IPc1: Integrative process
posted by Kena David on Apr 16, 2019, 4:40 pm

Has anyone been able to access updated v4.1 credit calculators? Is there any guidance on using new calculators versus v4 calcs at this point?

Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jan 23, 2023, 1:00 pm

PC 101 LEED v4.1

Pilot-Credits IPpc101: Integrative process
posted by Summer Minchew on Jan 23, 2023, 11:58 am

Our project team has implemented the Integrative Process for a project that was initially registered under LEED v4 O+M but during the course of the project was converted to LEED v4.1 O+M. We note...