Occupant Load & Usage QuestionNC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Jan 27, 2023, 11:43 am
Where does the project Occupant Load and Usage info get logged/docuemnted for the entire project? The WEc2 calculator includes areas where this infor needs be added, but this this... Last reply: emily reese moody, Jan 27, 2023, 11:50 am |
|
Refrigerants: Heat-pump out of leed boundadyCS-v4 EAc6: Enhanced Refrigerant Managementposted by D M on Jan 27, 2023, 6:50 am
Hi, i checking a building that has the main heat pump out of leed boundary, it is in common with other 2 buildings (not leed certified). Should I to consider this heat pump for... |
|
Different strategies in different roomsNC-v4.1 EQc6: Interior lightingposted by An Marc on Sep 21, 2021, 4:04 am
Our project (NCv4.1) consists of production area (regulary occupied) and office area. Can we applay strategies 1(Glare Control),2(Color Rendering),3(Lighting Control) for production area... Last reply: Emily Purcell, Jan 26, 2023, 3:57 pm |
|
External insulation to be compliant?CS-v4.1 EQc2: Low-emitting materialsposted by Norbert Szircsak on May 19, 2021, 5:17 am
Dear All, While the credit description starts with "use materials on the... Last reply: Maria Porter, Jan 26, 2023, 7:02 am |
|
Prime farmland evaluation?NC-v4 SSc1: Site assessmentposted by Nate Tsang on Jul 5, 2016, 10:18 pm
Does anyone have experience doing a soil survey to determine whether the site was on... Last reply: Adrian N. Lopez, Jan 25, 2023, 1:26 pm |
|
Desk Fan Fire SafetyNC-v4 EQc5: Thermal comfortposted by Jason Cocek on Jan 25, 2023, 12:11 pm
Has anyone run into the issue of fire marshall not allowing desk fans due to potential fire hazard? If so, what was the solution? Last reply: Dave Hubka, Jan 25, 2023, 12:20 pm |
|
Redirecting rainwater to bodies of water outside the project site?NC-v4 SSc4: Rainwater managementposted by LEED Pro Consultant on Jan 23, 2023, 4:57 pm
Hi everyone, Does redirecting rainwater to bodies of water outside the project site count as low-impact development (... Last reply: Gustavo De las Heras Izquierdo, Jan 23, 2023, 5:21 pm |
|
Deadline for hiring CxANC-v4 EAc1: Enhanced Commissioningposted by Elizabeth Powers on Jan 24, 2017, 1:16 pm
Does anyone know if there is a deadline for hiring the... Last reply: Dave Hubka, Jan 23, 2023, 1:27 pm |
|
4.1 calculatorsCI-v4.1 IPc1: Integrative processposted by Kena David on Apr 16, 2019, 4:40 pm
Has anyone been able to access updated v4.1 credit calculators? Is there any guidance on using new calculators versus v4 calcs at this point? Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jan 23, 2023, 1:00 pm |
|
PC 101 LEED v4.1Pilot-Credits IPpc101: Integrative processposted by Summer Minchew on Jan 23, 2023, 11:58 am
Our project team has implemented the Integrative Process for a project that was initially registered under LEED v4 O+M but during the course of the project was converted to LEED v4.1 O+M. We note... |