Topic | Recent |
---|---|
"photos with captions" requirement on PIf4General forumsposted by Erica Downs on Apr 4, 2011, 11:42 am
Project Info Form 4 asks for uploads of building photos "with captions". Is a descriptive file name sufficient, or must the photos be inserted in a document that allows for actual captions next... Last reply: David Posada, Apr 5, 2011, 12:11 pm |
|
SSc1 Option 2, Path 4: Heat IE-Nonroof- Parking Stall Calc.CI-2009 SSc1: Site Selectionposted by Michelle Bracewell-Musson on Apr 5, 2011, 10:08 am
The tenant is taking 19000 sf of a 100,000 sf existing building and making it CI. There are 60 underground parking stallas and about 200 outside (unshaded). The total number of stalls were put... Last reply: David Posada, Apr 5, 2011, 11:40 am |
|
South America weather dataNC-2009 EAc1: Optimize Energy Performanceposted by Carlos Alberto Hoyos Soto on Mar 25, 2011, 3:54 pm
Anyone knows what energy modeling software has developed South America weather data? Last reply: Marcus Sheffer, Apr 5, 2011, 10:01 am |
|
Modelling Condenser Efficieny in Baseline for LEEDNC-2009 EAc1: Optimize Energy Performanceposted by heinrich post on Mar 26, 2011, 9:05 am
We are modelling a building with water cooled chillers. Last reply: Marcus Sheffer, Apr 5, 2011, 10:00 am |
|
Occupant diversityCS-2009 IEQp1: Minimum indoor air quality performanceposted by Rubén M. R. on Mar 17, 2011, 1:54 pm
Im working on a C&S building and we have two space types: office and meting rooms. I would like to know if I can use occupant diversity (D) for the outdoor air calculations. The ventilation... Last reply: Roger Chang, Apr 4, 2011, 8:43 pm |
|
There are one bigCS-2009 IEQp1: Minimum indoor air quality performanceposted by Armen Khachikyan on Dec 16, 2010, 9:43 am
There are one big manufacturing space in my project for which I have to determine mechanically ventilation levels/ Last reply: Roger Chang, Apr 4, 2011, 8:40 pm |
|
Zones for a small CI 2.0 ProjectCI-2009 IEQp1: Minimum indoor air quality performanceposted by Greg Hackett on Mar 23, 2011, 12:59 pm
We have an office project (LEED CI 2.0) in an exsitng small building about 3500 s.f. The building is served by one existing central system that provides OA to the space. The layout of the space... Last reply: Roger Chang, Apr 4, 2011, 8:32 pm |
|
How late can you register a LEED CI Project?NC-2009 IEQc8.1: Daylight and views - daylightposted by Martin Meehan on Oct 4, 2010, 10:17 amin this forum thread. Log in or register to post comments Robert Bruce Architectural Intern Jacobs LEEDuser Premium Member April 4, 2011- 4:56 pm I had a similar question for a LEED-NC project, and the answer... Last reply: Robert Bruce, Apr 4, 2011, 4:56 pm |
|
EAc6 form not calculating savings from renewable energyNC-2009 EAc6: Green Powerposted by Dee Spiro on Apr 4, 2011, 4:09 pm
The EAc6 form seems to be automatically pulling the total annual electricity use number from the EAp2 form without taking into account our savings from... Last reply: Marcus Sheffer, Apr 4, 2011, 4:47 pm |
|
Renovation versus DemolitionNC-2009 IDc1: Innovation in Designposted by sara frye on Apr 4, 2011, 10:42 am
After much research and discussion it was decided to renovate an extremely decrepit farmhouse, portions of which date back to the 18th century. The renovation will serve as a visitor center with... Last reply: Tristan Roberts, Apr 4, 2011, 3:36 pm |