Topic | Recent |
---|---|
Split System AC in an existing buildingNC-v4 EAc6: Enhanced Refrigerant Managementposted by Charles Marshall on Aug 14, 2019, 4:58 pm
We are working on a major renovation project that contains several split system AC units which will be replaced. The owner doesn't have any record of the refrigerant volume that was charged for... Last reply: Afogreen Build, Apr 29, 2024, 9:49 pm |
|
Millwork built offsite and installed as built in cabinetryNC-v4.1 EQc2: Low-emitting materialsposted by Summer Gorder on Apr 29, 2024, 7:51 pm
I have Millwork that was built offsite and installed as built in cabinetry. I've seen a lot of back and forth on this and I'm wondering if it has ever finalized. It contains Plastic Laminate,... |
|
Integrative Design ProcessLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Birgitte Messerschmidt on Apr 29, 2024, 4:30 pm
The integrative design process should also address fire & electrical safety. Codes and standards do address safety but they are based on experience with traditional buildings and hence might... |
|
Resilient Site DesignLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Birgitte Messerschmidt on Apr 29, 2024, 4:19 pm
I am surprised that this one only refers to flooding. Wildfire should be added here as site design and maintenance are critical to ensure wildfire resilience. |
|
"Regular Occupants"NC-v4.1 LTc6: Bicycle facilitiesposted by Summer Gorder on Mar 28, 2023, 7:13 pm
What is considerd "Regular Occupants?" Last reply: Paulina L, Apr 29, 2024, 12:27 pm |
|
Designated Smoking Area at Level 2 GardenNC-v4.1 EQp2: Environmental tobacco smoke controlposted by Wah Wah on Jan 7, 2022, 3:28 am
Hello all, One of our projects has the garden at Level 2. The garden is naturally ventilated and has many greenery. Is it allowed to provide a designated smoking area there? we can make... Last reply: Brittny Castillo, Apr 29, 2024, 10:15 am |
|
v4.1 Option 2- Life Cycle Impact Reduction Action Plan- Where to find these?NC-v4.1 MRc2: Environmental Product Declarationsposted by Brian Salazar on Apr 26, 2024, 10:54 am
I have comments returned from the reviewer that the products we are using to clai Option 2 do not have a complete Life Cycle Impact Reduction Action Plan. The EPDs have been provided under... Last reply: Denise Bevilaqua, Apr 29, 2024, 9:23 am |
|
Separate Residential and Non-residential CalculationsNC-v4 LTc4: Surrounding density and diverse usesposted by Lucy Townsend on Apr 29, 2024, 9:00 am
Hi, This may seem like an obvious question but I have assumed that to achieve any points under the surrounding... |
|
Does the question through GBCI web-page cost anything?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Marine Petrosyan on Aug 24, 2023, 6:20 am
Hi, LEED Experts! Can you please guide me? Does the question through https://www.gbci.org/contact/ask-a-question webpage cost... Last reply: Afogreen Build, Apr 29, 2024, 2:46 am |
|
Minimum IAQ Performance calculatorNC-v4 EQp1: Minimum indoor air quality performanceposted by on Sep 8, 2023, 9:49 am
Why does the Minimum... Last reply: Afogreen Build, Apr 29, 2024, 2:45 am |