Log in
Forum
Topic

Installation Dates for LEED On-line

EBOM-2009 EAc5: Enhanced Refrigerant Management
posted by Andrew Barnes on Nov 1, 2010, 4:29 pm

Good day everyone. For our project site we have listed all of the units,
calculated all of the leakage rates, etc. However there are a few of our units that do not have an accurate (precise...

Last reply: Tristan Roberts, Nov 11, 2010, 11:58 pm

VOC [carpet adhesive] content determined by rapid schedule

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Peter Feibelman on Nov 5, 2010, 1:52 pm

My builder has an accelerated construction schedule, a familiar pace for him. He reports that - with inadequate slab curing time - only a high...

Last reply: Tristan Roberts, Nov 11, 2010, 11:41 pm

Can you count wood mulch in MRc4?

NC-2009 MRc4: Recycled Content
posted by Kelly Pimmel on Oct 26, 2010, 12:58 pm

Can you count the use of...

Last reply: Anne Nicklin, Nov 11, 2010, 10:09 pm

Bamboo

NC-2009 MRc7: Certified Wood
posted by Mara Baum on Feb 5, 2010, 9:04 pm

Are bamboo products considered as a part of this calculation?

Last reply: Tristan Roberts, Nov 11, 2010, 9:23 pm

Possible IO Credit

EBOM-2009 IOc1: Innovation in Operations
posted by Maria Unruh on Nov 11, 2010, 4:26 pm

I have a question about the scope of this credit. I am working with a client who has started a large amount of initiatives to educate his building occupants about sustainability; forming a green...

Last reply: Tristan Roberts, Nov 11, 2010, 9:12 pm

CS 2009 EAc1: Optimize Energy Performance

CS-2009 EAc1: Optimize Energy Performance
posted by eileen hughes on Nov 11, 2010, 4:44 pm

My project is currently under Design Review for CS 2009, Design Reviewer has not been assigned yet so I cannot direct message directly to the Reviewer at the moment.
General Contractor...

Last reply: Marcus Sheffer, Nov 11, 2010, 5:08 pm

Portables as diverted waste

Schools-2009 MRc2: Construction Waste Management
posted by Lisa Logan on Nov 10, 2010, 5:33 pm

Valerie,

It turns out that the portables were shown on the drawings and in the specs "to be demolished". During bidding the GCs went to great lengths to find homes for them - which...

Last reply: Valerie Walsh, Nov 11, 2010, 1:09 pm

Mercury Content

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Richard Navarro on Jul 7, 2010, 12:54 pm

Hi I was wondering what you are supposed to do if the manufacturer spec sheet has the number for picograms of mercury per mean lumen hour, but not the number for the amount of mercury content....

Last reply: Bill Swanson, Nov 11, 2010, 8:09 am

Mechanical/HVAC Engineer sign-off

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Janna Nash on Feb 3, 2010, 9:50 pm

Could somebody tell me which...

Last reply: Avkash Patel, Nov 10, 2010, 5:24 pm

LEED O+M 2009 vs LEED O+M 2012

General forums
posted by Avkash Patel on Nov 9, 2010, 2:35 pm

Great Analysis of the two rating systems. I am a LEED AP O+M and for my own knowledge I will be analyzing the 2009 LEED O+M system with the proposed 2012 LEED O+M system. If anyone is interested...

Last reply: Avkash Patel, Nov 10, 2010, 3:38 pm