FSC Exclusion

NC-2009 MRc7: Certified Wood
posted by Emily Kildow on Feb 9, 2010, 11:15 am

Has anyone ever heard of a project achieving this credit with an exclusion of certain...

Last reply: Sheri Lucas, Apr 19, 2010, 10:31 pm

Retail Space and EAp2/EAc1

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by D. G. on Apr 2, 2010, 8:08 pm

My question is about retail space and EAp2/EAc1. According to page xxiii of the Reference Guide, up to 10% of the floor area can be exempted from all credits (except EQp2) for multitenant...

Last reply: D. G., Apr 19, 2010, 10:14 pm

Going from LEED-NC to LEED-EBOM

General forums
posted by Tristan Roberts on Apr 19, 2010, 6:51 pm

Hi Kash, welcome to LEEDuser—it's good to have you!
It's probably best to think of LEED-...

Hi-Rise Smoking Patio

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Chris Munn on Apr 18, 2010, 12:56 am

I am working with a property that has a smoking patio located on the 6th floor. For a designated smoking patio that isnt in the path of regular occupant entry, would they still have to follow...

Last reply: Jason Franken, Apr 19, 2010, 10:09 am

Dealing with Basement Spaces in ASHRAE 62.1-2007

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Michael Wironen on Apr 16, 2010, 3:36 pm

Roger Chang Principal, Energy and Engineering Leader DLR Group | Westlake Reed Leskosky LEEDuser Expert 398 thumbs up April 19, 2010- 8:34 am There is an ASHRAE 62.1-2007 space category for electrical rooms (0.06 cfm/sf) and storage rooms (0.12 cfm/sf), which indicates they should be ventilated, even if they are not regularly occupied spaces. It would be good to get feedback from others on this forum also. Log in or register to post comments Mark Benson LEEDuser Basic Member 72 thumbs up April 19, 2010- 8:58 am Interpretation IC 62.1-2007-17 of ASHRAE 62.1-2007 clarifies that electrical rooms,...

Last reply: Mark Benson, Apr 19, 2010, 8:58 am

Compliance with SS Cr.5.1

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Armen Khachikyan on Apr 15, 2010, 2:10 am

Hello,
can anybody help me with the question:
We have a lot of topsoil and ground, removed from building footprint. As i understand - If we comply with SS Cr.5.1. we cannot use the...

Last reply: Armen Khachikyan, Apr 19, 2010, 2:05 am

provide LBS of food products purchased?

EBOM-2009 MRc5: Sustainable purchasing - food
posted by John Beeson on Apr 12, 2010, 10:02 pm

I have a vendor that doesn't want to reveal his pre-mark up prices on an existing contract, but will provide the quantities (in lbs) of the different products purchased. LEED wants cost (...

Last reply: Dan Ackerstein, Apr 18, 2010, 6:27 pm

SHGC of Skylight without Curbs

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Apr 14, 2010, 11:45 am

Hello,

Assuming we are using Option 2 - Prescriptive compliance Path, the roof skylight of our project would need to abide with the...

Last reply: Christopher Schaffner, Apr 17, 2010, 4:06 pm

ASHRAE 90.1-2007 Appendix G Energy Simulation

NC-2009 EAp2: Minimum Energy Performance
posted by Fabio Frescia on Apr 5, 2010, 6:12 am

We are working on the LEED design of a factory building. We are running an energy simulation: for the size of the building, according HVAC modeling requirements in ASHRAE 90.1, we would use...

Last reply: Christopher Schaffner, Apr 17, 2010, 3:48 pm

EA P2- ASHRAE 90.1 Compliance (Minimum Equipment Efficiency)

NC-2009 EAp2: Minimum Energy Performance
posted by Amruta Kshemkalyani on Apr 17, 2010, 6:33 am

Hi,
we are working on LEED Silver project in Abu Dhabi as MEP contractor. our project is supplied chilled water from other party. it is told to us by client that while procuring the...