Log in
Forum
Topic

Path 12- more than one point possible

CI-2009 SSc1: Site Selection
posted by James Weiner on May 19, 2011, 7:56 pm

We're curious if the review teams have changed approach with this.

We've understood that Path 12 allowed up to one point for exemplary performance of one of the other SSc1 Paths (1-11) as...

Last reply: James Weiner, May 20, 2011, 1:10 pm

LEED-EBOM

General forums
posted by Tristan Roberts on May 20, 2011, 12:10 am

Emma, this is a LEED-...

Last reply: Emma Sanborn, May 20, 2011, 12:29 pm

Exemplary Performance documentation

NC-2009 IDc1: Innovation in Design
posted by Ned Halling on May 5, 2011, 4:16 pm

After filling out a credit form online, the summary section has a 'Y' after exemplary performance points documented line. Do I still have to check the box saying: "The project team reserves one...

Last reply: Tristan Roberts, May 20, 2011, 3:00 am

SS Credit 1, Option 2, Path 5 Heat Island Effect – Roof

CI-2009 SSc1: Site Selection
posted by Augusto Velazquez on May 4, 2011, 9:24 am

I am working on a CI project. The project’s area is part of a large commercial facility which includes many other tenants. For the SS Credit 1 Option 2 Path 5...

Last reply: Tristan Roberts, May 20, 2011, 2:28 am

Is it possible to gain an ID credit by using Post Tensioning?

NC-2009 IDc1: Innovation in Design
posted by Amar Colakhodzic on Apr 28, 2011, 6:34 am

I am participating in a Value Engineering (VE) exercise for a potential LEED project that is in its final stage of design. Since the current project is designed as ‘concrete reinforced (CR)’, one...

Last reply: Tristan Roberts, May 20, 2011, 2:26 am

Storm water- Quality control

CI-2009 SSc1: Site Selection
posted by Sundararaj Subburaman on May 3, 2011, 10:56 pm

If a project has rainwater recharge pits located throughout the site can the project consider this as an infilteration Basin as listed in...

Last reply: Tristan Roberts, May 20, 2011, 2:23 am

FTE Calculation for Movie Theatres

Calculating FTEs
posted by Nilo Regojo on May 11, 2011, 12:33 pm

We are calculating...

Last reply: Tristan Roberts, May 20, 2011, 2:18 am

Baseline and design system selection

NC-2009 EAp2: Minimum Energy Performance
posted by Bala Srini on May 19, 2011, 10:39 am

Our semi industrial building's production area does not have cooling system, Proposed model simulated based on ASHRAE 90.1-2007, Table G3.1, 10. HVAC No. d “Where system exists or no cooling...

Last reply: Marcus Sheffer, May 20, 2011, 1:44 am

USGBC customer service

General forums
posted by Tristan Roberts on May 20, 2011, 12:13 am

Daniela, the company should have an account with USGBC.org, and an account admin who can log in and change details like names. If you have trouble finding this, I would contact USGBC customer...

LEED certification for zoo

General forums
posted by Tristan Roberts on May 20, 2011, 12:12 am

Erin, you cannot exempt a portion of the building in this way. You'll need to show savings in all areas of building eneryg use to earn LEED points. More information about this in the...