Log in
Forum
Topic

DSIRE...

General forums
posted by Tristan Roberts on Mar 7, 2011, 4:34 pm

DSIRE is the best nationwide resource on incentives like this. I would start there.

Exhausted heat

NC-2009 EAc1: Optimize Energy Performance
posted by Kath Williams on Mar 3, 2011, 12:42 pm

Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?

Last reply: Marcus Sheffer, Mar 7, 2011, 4:33 pm

SLL Prereq 1

General forums
posted by Peter Doo on Feb 26, 2011, 8:56 pm

I'm working on a predeveloped 95 acre site at the end of a peninsula. One drives through and existing residential neighborhood that does not have many diverse uses. The existing site was a...

Last reply: Ted Bardacke, Mar 7, 2011, 2:57 pm

Systems Furniture Panel Fabric

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Lori Selcer on Feb 21, 2011, 7:14 pm

We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer. While the...

Last reply: Randal Carter, Mar 5, 2011, 8:54 am

Savings calculations

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Sundararaj Subburaman on Feb 9, 2011, 2:04 am

Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers. The conditioned area of the project area alone is 45,000 sqft...

Last reply: Sundararaj Subburaman, Mar 4, 2011, 11:57 pm

Existing bus stop

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by lance mccardle on Mar 3, 2011, 4:46 pm

We are doing a major renovation on a multifamily housing complex that was built in 1990 with bike racks and a bus stop that the owners put in when the building was first constructed. The only...

Last reply: David Posada, Mar 4, 2011, 1:16 pm

LEED CI- Minimal TI for a Large Space = CI Cert?

LEED Rating System Selection
posted by Michelle Bracewell-Musson on Mar 4, 2011, 12:19 pm

CI requires a minimum 250 SF to be renovated. We meet that, however, the space is two floors totaling 50,000 SF and she only wants to modify 7,000 SF, and wants the whole two floors (50,000 SF)...

Last reply: David Posada, Mar 4, 2011, 1:01 pm

Owner maintained carpet entry systems

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Susan Walter on Feb 10, 2011, 9:02 am

I have an in patient Hospital project and we are providing roof gardens and access to those gardens. Hooray for...

Last reply: David Hubka, Mar 4, 2011, 9:55 am

Can LEED for Homes be used for projects outside the US?

LEED Rating System Selection
posted by dia2000@gmail.com dia2000@gmail.com on Mar 4, 2011, 3:02 am

Hi,

I have a request from a client to get a Residential Compound in KSA certified under LEED for home. The compound is composed of 4 standalone private villas. My basic understanding is...

Last reply: Courtney Baker, Mar 4, 2011, 9:53 am

Completing the LEED Template for WEp1

CI-2009 WEp1: Water Use Reduction
posted by R Jones on Feb 21, 2011, 11:55 am

We are needing to go down the route of Case 4 where there are facilties in landlors and tenant areas but we can only pursue the WEp1 which is fine. However out of our 10 floor project toilets are...

Last reply: R Jones, Mar 4, 2011, 4:30 am