Divisions 31 and 32 should be included

General forums
posted by Tristan Roberts on Mar 1, 2010, 11:42 am

Are you referring to a LEED Online sample template or a LEEDuser sample provided here on this site? If the latter, I'd like to correct it if it's off.

The materials cost calculations for...

Last reply: Tristan Roberts, Mar 1, 2010, 2:21 pm

ID Credits under 2009 CI

CI-2009 SSc2: Development Density and Community Connectivity
posted by Rona Easton on Mar 1, 2010, 12:38 pm

Shannon, what do you think about attempting an ID credit for alternative transportation? I have a feeling this might be easier to attempt.

Last reply: Shannon Gray , Mar 1, 2010, 1:03 pm

Pressure of faucets

NC-2009 WEp1: Water Use Reduction
posted by Claudia Rieger on Feb 26, 2010, 11:25 am

Hi everybody,
I´ve already filled out the template, but I´ve a doubt. In the design building we have installed faucet with a min pressure of 7.25 psi, max pressure of 21.76 psi and 1.59 gpm...

Last reply: Bill Swanson, Feb 26, 2010, 3:37 pm

Sports Arena- Flood Lighting for HD Television

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Jean Marais on Feb 26, 2010, 11:41 am

Usually I treat flood lighting for sports arenas as a process. Is there an exception for process lights?

A good expensive flood light is as follows:

OSRAM HQI®-TS metal halide...

Last reply: Tristan Roberts, Feb 26, 2010, 11:47 am

Option 2: 50 Watt fixture or 50 Watt lamp?

EBOM-2009 SSc8: Light Pollution Reduction
posted by Matthew Macko on Feb 25, 2010, 4:25 pm

Does the option 2 exemption for exterior lighting apply to fixtures with ratings greater than 50 watts but using lamps 50 watts or less? We have a project with unshielded exterior light fixtures...

Timeline for Hiring a Commissioning Agent

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Andrea Anderson on Feb 25, 2010, 11:18 am

Is it mandatory that the...

Last reply: Bethany Beers, Feb 25, 2010, 3:01 pm

Additional Documentation

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Maya Karkour on Feb 24, 2010, 7:09 am

Hi all,

I had a question regarding the documentation to upload for this credit.

I realize that the...

Last reply: Chris Ladner, Feb 25, 2010, 8:58 am

Soil Infiltration

Schools-2009 SSc6.1: Stormwater design - quantity control
posted by Gregory Hurst on Feb 24, 2010, 6:26 pm

You bring up a good discussion. Typically when SSc6.1 is evlauated, you can use the...

Re-used wood

NC-2009 MRc7: Certified Wood
posted by Lauren Sparandara on Jan 25, 2010, 3:46 pm

If you are taking...

Last reply: Tristan Roberts, Feb 23, 2010, 12:10 pm

Hot reaction...

NC-2009 EAc3: Enhanced Commissioning
posted by Kath Williams on Feb 21, 2010, 1:57 pm

During my workshop last weekend, I posed the question above for discussion. Here was an intense reaction, which I took verbatim from the tape...

The energy modeler, when hired as a...

Last reply: Chris Ladner, Feb 23, 2010, 9:18 am