For the Case1 where the

CI-2009 EAc3: Measurement and Verification
posted by Santhosh Manavalan on Dec 13, 2010, 12:09 am

For the Case1 where the project is less than 75% of the building area, if we have to get the 3 points related to the agreement between the tenant and the building owner.

The electricity...

Last reply: Gordon Shymko, Jan 11, 2011, 6:24 pm

toner cartridges

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Alice Cook on Jan 11, 2011, 5:48 pm

The LEED template for v2008 asks that we check a box stating that 'the materials data reported in the calculations below includes, but is not limited to, paper, toner cartridges, glass, plastics...

Last reply: Dan Ackerstein, Jan 11, 2011, 6:05 pm

GSF not part of initial fit-out or alteration- PI form 2

General forums
posted by Michael Dulcich on Jan 6, 2011, 3:06 pm

What is an example of GSF not part of an initial fit-out or an alteration? Would it include any of the core/exist mechanical spaces?
We have a core & shell where we are doing the...

Last reply: David Posada, Jan 11, 2011, 4:47 pm

Edge guards for green roofs

NC-2009 SSc7.2: Heat island effect - roof
posted by Steve Cattaneo on Aug 2, 2010, 11:55 am

We are designing a low rise residence and the local building official believes we need guard rails an edges > 30'' above grade. We are providing anchor points for maintenance staff. Roof...

Last reply: Susan Walter, Jan 11, 2011, 4:01 pm

Clarification

Pilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by Alejandra Feliciano on Jan 11, 2011, 12:32 pm

Hello! I just want a very general clarification on the submittal requirements for this credit. Specifically, I'd like clarificaiton on the meaning of 'multi-parameter alternative product analysis...

Last reply: Abena Darden, Jan 11, 2011, 3:18 pm

Pilot Credits 5 & 6 Closing Today

Pilot-Credits PC6: Integrative Project Planning & Design
posted by Batya Metalitz on Jan 11, 2011, 11:50 am

As a reminder, this credit, and credit 5 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in...

Last reply: Renee Shirey, Jan 11, 2011, 3:14 pm

saving LOv3 forms

General forums
posted by Tristan Roberts on Jan 11, 2011, 3:02 pm

Your understanding on both points is correct. If you save the form, you can continue to edit it, until it's submitted for review.
Downloading the form can be helpful for offline work but...

ASHRAE 62.1-2007 section 4

CI-2009 IEQp1: Minimum indoor air quality performance
posted by G.J. Teunissen on Nov 10, 2010, 5:12 am

According to this section, a local survey is needed to document the local air quality. But even the...

Last reply: G.J. Teunissen, Jan 11, 2011, 2:53 pm

Pilot Credits 5 & 6 Closing Today

Pilot-Credits PC5: Preliminary Integrative Project Planning & Design
posted by Batya Metalitz on Jan 11, 2011, 11:49 am

As a reminder, this credit, and credit 6 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in...

Last reply: Joanna Rodriguez, Jan 11, 2011, 1:56 pm

VAV System- LEED Online ventilation rate procedure?

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Maya Karkour on Jan 5, 2011, 7:50 am

Dear all,

As I noticed, the LEED Online letter template for IEQ Prereq1 can not be used for...

Last reply: Roger Chang, Jan 11, 2011, 1:13 pm