Topic | Recent |
---|---|
Thermal bridges in the modelNC-2009 EAc1: Optimize Energy Performanceposted by Lisa Håkansson on Aug 5, 2010, 3:02 am
I can’t find anywhere how detailed the thermal brides should be calculated in the model. In the simulation program I use you can use some default values or calculate the separately in every... Last reply: Marcus Sheffer, Aug 9, 2010, 5:24 pm |
|
Major renovation: HVAC system in baselineNC-2009 EAc1: Optimize Energy Performanceposted by Lisa Håkansson on Aug 5, 2010, 2:55 am
Hi! Last reply: Marcus Sheffer, Aug 9, 2010, 5:19 pm |
|
Proposed HVAC System vs. Baseline SystemNC-2009 EAc1: Optimize Energy Performanceposted by Meagan Kirchhoff on Aug 4, 2010, 8:36 pm
I am having a hard time determining what type of system I should be modeling for my building in both the Proposed AND the Baseline. Here is the deal: Last reply: Marcus Sheffer, Aug 9, 2010, 5:15 pm |
|
Energy Efficient Measures Prior to LEED RegistrationNC-2009 EAc1: Optimize Energy Performanceposted by Jaimee Reynolds on Jul 26, 2010, 1:21 pm
An existing building has replaced their windows and roof in 2007, exceeding ASHRAE 90.1-2007 standards. The building is currently going through a large renovation and will be registering under... Last reply: Marcus Sheffer, Aug 9, 2010, 5:06 pm |
|
Letter Templates Not TransferringCI-2009 MRc4: Recycled Contentposted by Patrick Moore on Aug 3, 2010, 7:54 pm
Has anyone had issues with information you enter on the Recycled Content letter templates not automatically populating on... Last reply: Erica Godun, Aug 9, 2010, 3:52 pm |
|
CS 2009 SSc8: Light Pollution ReductionCS-2009 SSc8: Light Pollution Reductionposted by Viann Lau on Aug 9, 2010, 6:55 am
For interior lighting of CS 2009 SSc8, does it include covered carparking areas? If dimming of light would cause security problem, which option would be more applicable for achieving this credit... |
|
LEED Online v2.0CS-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on Jul 29, 2010, 11:00 am
I'm sorry if this is to obvious question but I'm new at this. Last reply: javier bolanos zeledon, Aug 8, 2010, 9:08 pm |
|
Help with Interpretation!CI-2009 EAp3: Fundamental Refrigerant Managementposted by Dan LeBlanc on Mar 18, 2010, 12:13 pm
What is clear is that all equipment within the LEED-CI scope must be CFC-free. Whether this extends to the base-building systems is still unclear. Although the prerequisite seems to include only... Last reply: Shillpa Singh, Aug 6, 2010, 3:23 pm |
|
Lighting Power DensityCS-2009 SSc8: Light Pollution Reductionposted by Tom Fik on Aug 6, 2010, 3:22 pm
Is there maximum allowable... |
|
Building Area Method Compliance PathCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Andreas M. Roessler on Aug 6, 2010, 8:13 am
We've got a question concerning "Building Area Method Compliance Path" in the Chapter 9: "Lighting", ASHRAE Standard 90.1-2007. Appendix G: Performance Rating Method involves the Table G3.... Last reply: Dane Sanders, Aug 6, 2010, 2:02 pm |