62MZ Calculation for IEQ2- For VAV SystemsSchools-2009 IEQc2: Increased Ventilationposted by Laura Long on Nov 24, 2010, 4:19 pm
The LEED Reference Guide only addresses the increased ventilation calculation at the zone level, not the system level. I understand that the outdoor air supplied to each zone needs to be... Last reply: Julia Weatherby, May 11, 2011, 9:58 am |
|
specific mechanical drawings for PI4?General forumsposted by Erica Downs on Apr 4, 2011, 2:59 pm
Does anyone know specifically which "mechanical" drawings... Last reply: Kimberly Frith, May 11, 2011, 9:12 am |
|
Increase Ventilation- CorridorCI-2009 IEQc2: Increased Ventilationposted by Simon Sue on May 10, 2011, 2:32 am
Hi, Last reply: David Hubka, May 10, 2011, 2:48 pm |
|
Remnant Limestone- any LEED credit there?CS-2009 MRc3: Materials Reuseposted by Julie Hendricks on May 9, 2011, 4:37 pm
My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding. My instinct tells me these pieces won't count as either... Last reply: Julie Hendricks, May 10, 2011, 9:29 am |
|
Occupancy SensorCI-2009 EAp2: Minimum Energy Performanceposted by Simon Sue on May 9, 2011, 3:40 am
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors). do we... Last reply: Kimberly Frith, May 10, 2011, 8:23 am |
|
LEED CI v3 in a central London building 3 out of 40 floorsCI-2009 EAp2: Minimum Energy Performanceposted by R Jones on Sep 6, 2010, 10:53 am
I am trying to undertake the assessment of EAp2 and EA1 energy credits for a building in central London. Its about 40 floors but the project scope is to renovate only 3 floors. None of the... Last reply: Eszter Gulacsy, May 10, 2011, 7:51 am |
|
EAPr2- Lighting Control (shut-off control and space control)CI-2009 EAp2: Minimum Energy Performanceposted by Ramesh Narayanan on Feb 25, 2011, 1:55 am
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory... Last reply: Simon Sue, May 10, 2011, 3:12 am |
|
Five year shade calculation.NC-2009 SSc7.1: Heat island effect - nonroofposted by sara frye on Apr 27, 2011, 4:34 pm
Apologies in advance as I know I have read the answer to my question somewhere. I just can't find it. WHEN should the five year shade calculation be performed? i.e time of day, time of year?... Last reply: Jacob Arlein, May 9, 2011, 8:16 pm |
|
Prescriptive Method: skylight zones?NC-2009 IEQc8.1: Daylight and views - daylightposted by Kash Boodjeh on May 9, 2011, 4:56 pm
Hello, We are pursuing the Prescriptive Method for this credit, using both skylights and windows. I am entering in the data for the skylights and am not sure how to answer the first two... |
|
Existing lighting in project boundarySchools-2009 SSc8: Light Pollution Reductionposted by Lisa Logan on May 9, 2011, 1:12 pm
My project boundary includes a baseball playing field which will be new - but the lighting around it is existing. Our reviewer wants info on that lighting but to find IES photometric files for... |