Topic | Recent |
---|---|
Pricing- ToolkitEBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by Paul C on Sep 17, 2010, 10:31 am
The pricing document in the toolkit does not provide any pricing numbers. I am just trying to get a feel or what costs are in order to achieve this credit. Thanks. Last reply: Tristan Roberts, Sep 17, 2010, 1:09 pm |
|
Glass Fiber Reinforced ConcreteNC-2009 MRc5: Regional Materialsposted by Linda Davisson on Sep 17, 2010, 9:38 am
I'm looking for GFRC that is manufactured and extracted from within 500 miles of the DC metro area. I tried using the website mrgreenpoints.com but it only gave one local manufacturer. It's so... |
|
Non-centralised AC for office towerCS-2009 EAp2: Minimum Energy Performanceposted by Edwin Wealend on Sep 8, 2010, 12:25 am
HI, We are working on a small soho office tower, about 28 floors tall with a GFA of around 20000m2. We want to use split type or VRV AC unit for the offices instead of doing a full blown... Last reply: Edwin Wealend, Sep 16, 2010, 7:44 pm |
|
Minimum distance between smoking room exhaust and windowsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Maya Karkour on Sep 14, 2010, 10:06 am
Hello, Under option 2 of this credit, the LEED Guidance states that: "At a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes and building entry... Last reply: Tristan Roberts, Sep 16, 2010, 5:47 pm |
|
HERS RaterNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by David Herrera on Sep 13, 2010, 1:33 pm
Hello, I wanted to ask if I perform a Door Blower Test with a HERS Rater will it be acceptable by the USGBC to comply with my... Last reply: Tristan Roberts, Sep 16, 2010, 5:44 pm |
|
IAQP1EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Rafael Negron on Jul 13, 2010, 11:35 am
We are working with a very large commercial building with many tenants and pursuing LEED... Last reply: Jenny Carney, Sep 16, 2010, 5:39 pm |
|
Collected StromWater for irrigationEBOM-2009 SSc6: Stormwater Quantity Controlposted by Simon Sue on Sep 16, 2010, 2:34 am
Hi, Last reply: Tristan Roberts, Sep 16, 2010, 5:21 pm |
|
Solid Surface Materials; Quartz, Corian, etc. claiming RegionalNC-2009 MRc5: Regional Materialsposted by Jennifer Preston on Sep 14, 2010, 1:52 pm
We have recently had a material rep in our office claiming that Quartz can be used to contribute to regional materials because the local (within 500 miles)... Last reply: Tristan Roberts, Sep 16, 2010, 5:16 pm |
|
How to address area requirementsCS-2009 SSc7.2: Heat island effect - roofposted by javier bolanos zeledon on Sep 4, 2010, 8:32 am
Hi, Last reply: javier bolanos zeledon, Sep 16, 2010, 4:13 pm |
|
Project's lower roof shaded by elevated new constructionNC-2009 SSc7.2: Heat island effect - roofposted by Karen Hutcheson on Aug 25, 2010, 5:00 pm
Our project has an elevated second story over an existing ballasted roof (river rock). The new white roof membrane meets the credit requirement with an... Last reply: Tristan Roberts, Sep 16, 2010, 3:30 pm |