Which point in time do I take for ascerting imperviousness?

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Christian Brücher on Dec 17, 2010, 5:05 am

Hello,
following "problem": we have a project which will be built on a site which was an abandoned industrial site up to 2009. Then all buildings and surfaces were demolished and the site...

Last reply: Tristan Roberts, Jan 21, 2011, 4:47 pm

Campus services and LEED project boundary

General forums
posted by Alexia Anastassiadis on Jan 21, 2011, 3:17 pm

We are working on a new building in an existing industrial campus. The company produces it's own electricity and potable water, but the building will have a boundary that is not the same as the...

Last reply: Tristan Roberts, Jan 21, 2011, 4:30 pm

LEED Online agreement

General forums
posted by Tristan Roberts on Jan 21, 2011, 3:07 pm

John, you mean the LEED Online agreement. I just wrote an...

Last reply: John Ida, Jan 21, 2011, 4:24 pm

Acceptable documentation for LEED for Schools, 2007

Schools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems
posted by Alison Y Rivenburgh on Jan 21, 2011, 11:54 am

For a LEED for Schools, 2007 project we have provided for the LEED construction documentation reviewers a list of ceiling and wall system components used on the project with the coordinating...

Last reply: Josh Jacobs, Jan 21, 2011, 4:22 pm

Flat Primer VOC

Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
posted by Denise Shimabukuro on Dec 6, 2010, 4:40 pm

GS-11 allow primers to have a...

Last reply: Josh Jacobs, Jan 21, 2011, 4:21 pm

ASHRAE 62 Calcs

EBOM-2009 IEQc1.3: Indoor air quality best management practices - increased ventilation
posted by Richard Navarro on Jan 13, 2011, 6:00 pm

I input information into their Online spreadsheet, but the numbers didn't seem to match with what our Engineer has as constants for the spaces when the ASHRAE 62 Audit was done. Also some spaces...

Last reply: Dan Ackerstein, Jan 21, 2011, 3:54 pm

Definition of Occupied Space

EBOM-2009 IEQc1.2: Indoor air quality best management practices - outdoor air delivery monitoring
posted by Simon Sue on Jan 18, 2011, 5:14 am

LEED EBOM ed 2009,...

Last reply: Dan Ackerstein, Jan 21, 2011, 3:44 pm

2007UM_62MZCalc.xls and Table. Ventilation Air Flow Summary

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Simon Sue on Jan 11, 2011, 1:18 am

The credit prompts you to fill out 2007UM_62MZCalc.xls to calculate required OA, and transfer the data to submittal form in LEED online under "Table. Ventilation Air Flow Summary." However, with...

Last reply: Dan Ackerstein, Jan 21, 2011, 3:34 pm

see the FAQ

General forums
posted by Tristan Roberts on Jan 21, 2011, 2:53 pm

Hi Caroline, I have an attempted answer to this question in our FAQ (link to that is in the right sidebar of every page, FYI).
We would...

Path 2 Stormwater Quantity Control

CI-2009 SSc1: Site Selection
posted by Seung Shin Na on Jan 16, 2011, 10:07 pm

Our future building owner is considering to install stormwater collection tank. Therefore we're trying to recommend the owner to comply with the LEED requirement.
As this site's previous...

Last reply: Amy Rider, Jan 21, 2011, 2:45 pm