Topic | Recent |
---|---|
LEED CI- Retail: IEQ4.6, Ceiling and Wall SystemsGeneral forumsposted by Melissa Wrolstad on May 5, 2011, 3:50 pm
Is it acceptable to use Greenguard certified products to meet the requirements of this credit? The credit requires products to meet the California Department of Health Services Standard... |
|
Estimated crown diameterPilot-Credits PC14: Walkable Streetsposted by Christina Lynch on Mar 22, 2011, 9:13 am
Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks! Last reply: Chris Marshall, May 5, 2011, 3:44 pm |
|
Unirrigated areas in Option 1NC-2009 WEc1: Water Efficient Landscapingposted by Eamon Geary on Apr 8, 2011, 11:04 am
Hello, Last reply: Erica Downs, May 5, 2011, 2:38 pm |
|
ETS and Ventilation Requirements for Residential ProjectsNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Rick Gehrke on Sep 17, 2010, 1:51 pm
Case 1, Option 2 states that at a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes and building entry paths, with no recirculation of... Last reply: Susann Geithner, May 5, 2011, 1:08 pm |
|
WE p1/C3 in Core & ShellNC-2009 WEc3: Water Use Reductionposted by Anu Sumanth on May 4, 2011, 3:49 pm
If all the plumbing fixtures are to be installed in future by tenant, and if I check Tenant Neutral for WE p1; I will not be able to achieve the prereq. 20%. Is this typical? Last reply: Susann Geithner, May 5, 2011, 12:53 pm |
|
80% adoption for CaGBC usersEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Emma Sanborn on May 5, 2011, 11:54 am
Note to any CaGBC users: CaGBC doesn't mention a 20% minimum anywhere in SS c2. It mentions demonstration that best practices were used to a "significant degree...at least 80% of the time." I've... |
|
Water filtrationCS-2009 SSp1: Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on May 5, 2011, 11:36 am
How much filtration is required when discharging rainwater that contains suspended solids? We have some rainwater acumulation and we would like to know if a simple screening will be enough... |
|
ASHRAE 62.1- 2007 section 5.9 Particulate Matter RemovalNC-2009 IEQp1: Minimum indoor air quality performanceposted by Carolina Vergnano on Mar 17, 2011, 1:18 pm
To comply with the section 5.9, Particulate Matter Removal, the HVAC system needs to have a filter or an air cleaner having a minimum efficiency of... Last reply: Carolina Vergnano, May 5, 2011, 8:25 am |
|
WEp1 Scope or Space?CI-2009 WEp1: Water Use Reductionposted by Michelle Bracewell-Musson on Mar 4, 2011, 12:54 am
The Bird's Eye above states only fixtures within the project 'SCOPE' which would mean that a project that does not include plumbing fixtures, would be exempt. On the contrary,... Last reply: Cristina Ainslie, May 4, 2011, 3:06 pm |
|
Advice on reporting Controller Efficiency?NC-2009 WEc1: Water Efficient Landscapingposted by Annette Bellafiore on Jul 19, 2010, 6:37 pm
Does anyone have any advice on reporting controller efficiency on the LEED templates? The reference guide says to "determine, if applicable, the CE..." Yet, if you don't think it's applicable... Last reply: Puteri Shireen Jahnkassim, May 4, 2011, 1:25 pm |