Topic | Recent |
---|---|
About Option 3: MeasurementCS-2009 IEQc8.1: Daylight and views - daylightposted by Diego Prada on May 5, 2011, 4:02 pm
Hello, If one decides to use option 3 to show compliance with this credit, should the light measurements have to be done in a specific time of the day? This doesn't seems to be the case,... Last reply: TODD REED, Aug 26, 2011, 10:13 am |
|
is a closed landfill automatically a brownfield?NC-2009 SSc3: Brownfield Redevelopmentposted by Amanda Redmond-Neal on Aug 12, 2011, 1:42 pm
My project is to be built on top of a landfill that was closed in 1961. I have a very comprehensive "Final Closure and Post-Closure Maintenance Plan" that details required monitoring of the site... Last reply: Larry Sims, Aug 26, 2011, 9:28 am |
|
Region Where LT Leases are NOT CommonCI-2009 MRc1.1: Tenant space - long-term commitmentposted by Raymond Loo on Jul 27, 2011, 11:12 pm
Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit? Do they consider the circumstances that a 5+5... Last reply: Raymond Loo, Aug 26, 2011, 9:11 am |
|
Non smoking facilityEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Barbara Redmond on Mar 24, 2010, 10:24 am
Hi, My company became a "smoke free" workplace effective January 1, 2010. All the documentation I have read says that we need both a policy and a communication for this pre-req. However, when I... Last reply: Elliot Powers, LEED AP BD+C, Aug 26, 2011, 4:50 am |
|
Thermal blocks for multifamily residential buildingNC-2009 EAp2: Minimum Energy Performanceposted by Emma Eliasson on Aug 12, 2011, 6:51 am
I have a question about thermal blocks in multy family residential buildings. I'm working with a building that has 4 floors and totly 7 appartments. Floor 1-3 have 2 appartments and the... Last reply: Nadav Malin, Aug 25, 2011, 11:35 pm |
|
Projected Biomass BoilerNC-2009 EAc2: On-Site Renewable Energyposted by Jose Salinas on Aug 4, 2011, 10:22 am
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust. The fase out of the... Last reply: Nadav Malin, Aug 25, 2011, 11:25 pm |
|
PV Watts for other countries?NC-2009 EAc2: On-Site Renewable Energyposted by Nelina Loiselle on Aug 17, 2011, 5:19 pm
Help Please! Our... Last reply: Nadav Malin, Aug 25, 2011, 11:23 pm |
|
Ventilation Rate Schedule sampleNC-2009 IEQp1: Minimum indoor air quality performanceposted by Nelina Loiselle on Aug 9, 2011, 2:14 pmNelina Loiselle Above Green LEEDuser Basic Member 239 thumbs up August 11, 2011- 10:56 am Is there only one Ev rate for the whole system. Log in or register to post comments Nadav Malin CEO BuildingGreen, Inc. LEEDuser Moderator 844 thumbs up August 25, 2011- 11:17 pm Thanks, Nena, We'll look into this and see if there something better. Anyone on the forum have a sample they'd like to offer? Log in or register to post comments ... Last reply: Nadav Malin, Aug 25, 2011, 11:17 pm |
|
Reclaimed Mahogany on Homes ProjectLEED for Homes (LEED-H) Forumposted by anastasia harrison on Aug 11, 2011, 12:53 pm
Is it permissible to use a reclaimed mahogany door that is not... Last reply: Peter Kennedy, Aug 25, 2011, 10:22 pm |
|
Equivalent to Green-ECI-2009 EAc4: Green Powerposted by Wayne L. Appleyard on Jun 27, 2011, 11:47 am
Has anyone defined this? We are looking at purchasing RECs directly from one or more schools or other non-profits that have not sold RECS. We have an independent who has experience with... Last reply: Susann Geithner, Aug 25, 2011, 6:00 pm |