Topic | Recent |
---|---|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Lauren Fakhoury on Sep 9, 2011, 11:16 am
Is there a way to calculate rated power? I am trying to find the rated power of a printer. I called the manufacturer and they do not know, but I have some informatoin regarding power usage from... Last reply: Steve Loppnow, Dec 19, 2011, 3:25 pm |
|
Establishing the LEED Project BoundaryNC-2009 SSc5.2: Site development - maximize open spaceposted by Robert Mulcahy on Jul 11, 2011, 3:28 pm
I’m trying to confirm the LEED Project Boundary. Normally, the LEED Project Boundary for a single building development would be the same as the site boundary. However, the construction of our... Last reply: Manny Iglesia, Dec 19, 2011, 3:24 pm |
|
Tennis Court use for meeting SSc5.2 Maximize Open SpaceNC-2009 SSc5.2: Site development - maximize open spaceposted by JOHN COOK on Jul 15, 2011, 11:41 am
Can we count count our Tennis courts - that are part of the project boundary towards our Space requirement in Case 2? The courts are hardscaped. Last reply: Manny Iglesia, Dec 19, 2011, 3:17 pm |
|
Glass partition system with aluminium framesCI-2009 MRc4: Recycled Contentposted by Yong Lee Low on Oct 3, 2011, 11:39 pm
We are using an interior partition system which includes aluminium frames and glass partitions.The aluminium frames have... Last reply: Susan Walter, Dec 19, 2011, 2:15 pm |
|
Permeable pedestrian sidewalkCS-2009 SSc5.1: Site development - protect or restore habitatposted by MARCIO OROFINO on Dec 9, 2011, 8:58 am
Would anyone inform if permeable pedestrian sidewalk on the ground, recharging groundwater, may be counted towards the achievement of the restored área and ecollogic site feature? Last reply: MARCIO OROFINO, Dec 19, 2011, 1:52 pm |
|
Refueling Station As a Separate ProjectCS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Sarah Corbitt on Dec 9, 2011, 3:45 pm
Hi, there. The project I'm submitting does not have parking within the project boundary. It's a Core and Shell renovation on a tight urban lot. As part of a separate project, my firm is... Last reply: Tristan Roberts, Dec 19, 2011, 1:02 pm |
|
Repair BaysNC-2009 IEQc2: Increased Ventilationposted by Esperanza Adams on Dec 12, 2011, 12:07 pmRoger Chang Principal, Energy and Engineering Leader DLR Group | Westlake Reed Leskosky LEEDuser Expert 398 thumbs up December 19, 2011- 9:33 am Based on the language of this credit, the emphasis is on supply side breathing-zone ventilation, rather than exhaust. Has anyone else on this forum had to provide 30% more exhaust to meet this credit? Log in or register to post comments Dylan Connelly Mechanical Engineer Integral Group LEEDuser Expert 472 thumbs up December 19, 2011- 11:34 am The credit language does not mention exhaust. The increase in ventilation applied to only regularly occupied spaces.That... Last reply: Dylan Connelly, Dec 19, 2011, 11:34 am |
|
VOC Limit for Insulation Anchor Adhesive?NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Beth Mosall on Dec 16, 2011, 3:41 pm
I have had someone submit Midwest Fasteners IHA-170 Insulation Anchor Adhesive to me. It has a... Last reply: John-David Hutchison, LEED AP BD+C, PMP, Dec 19, 2011, 11:04 am |
|
VRP Compliance CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Juliana Malho on Nov 24, 2011, 7:59 am
We have a CI project with multiple zone units and... Last reply: Roger Chang, Dec 19, 2011, 9:48 am |
|
Material ValuesCI-2009 MRc4: Recycled Contentposted by Holly Himes on Nov 30, 2011, 6:23 pm
On the IDC Materials Calculator download from LEED-online states in footnote 2 that material value must "include all expenses to deliver the material to the project site, including taxes and... Last reply: Nadav Malin, Dec 19, 2011, 9:27 am |