Log in
Forum
Topic

MERV 13 filters on fan coil units

Schools-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by james moler, p.e. on Jan 12, 2012, 8:11 pm

Numerous...

Last reply: Dylan Connelly, Feb 17, 2012, 8:08 pm

Recycling Areas Designation

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Sunayana Jain on Feb 14, 2012, 8:21 am

In the floor plan, is it required to document the recycling areas as paper, corrugated cardboard, glass, plastics and metals specifically or just designating as recycled areas in floor plan will...

Last reply: Emily Catacchio, Feb 17, 2012, 7:31 pm

Can the existing roof count?

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Kelly Wieczorek on Feb 16, 2012, 12:22 pm

If our existing roof meets the requirements can we achieve the credit, or does there have to be a change/upgrade from the existing to comply?

Last reply: Emily Catacchio, Feb 17, 2012, 7:23 pm

non-finished flooring for C&S

CS-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Natalie Ng on Mar 29, 2011, 12:07 am

the project is an office building development, the project proponent would like to leave the feasiblity of installing carpet to the tenants thus the floor will be concrete finish with raised...

Last reply: Lauren Sparandara, Feb 17, 2012, 7:12 pm

No new parking except for 3 LE/FE spaces

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Nelina Loiselle on Jan 23, 2012, 11:48 am

I'm working on a campus building where we have added only 6 new spaces (3 of which are ADA) I understand the ADA can be exempted, but since the other 3 new ones are being added to be reserved for...

Last reply: Tristan Roberts, Feb 17, 2012, 6:24 pm

Hotel and counting drop-off spaces

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Lauren Ford on Feb 14, 2012, 9:33 pm

Hello - we have a hotel project and are attempting Option 1. The question is - we are meeting the zoning requirement for number of spaces, PLUS we have 3 drop-off (15 minute) spaces. Do the...

Last reply: Tristan Roberts, Feb 17, 2012, 6:22 pm

Open space below the building

NC-2009 SSc5.2: Site development - maximize open space
posted by Ramón Gutiérrez on Dec 19, 2011, 1:09 pm

Hello from Spain,
Our ground floor is smaller than our building footprint. So we have vegetated open spaces at ground level, outside of our ground floor and below the building.
Two...

Last reply: Tristan Roberts, Feb 17, 2012, 5:59 pm

Ceiling "Reuse"

NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Caroline O'Leary on Nov 29, 2011, 11:28 am

I'm cross posting from CI MRc1.2:

I see this was partially covered in Jean's discussion but I'm going to see if any of you have any further clarification. We removed a suspended acoustical...

Last reply: Tristan Roberts, Feb 17, 2012, 4:37 pm

Historic plaster to receive new plaster skimcoat

NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Rebekah Burke on Feb 16, 2012, 12:52 pm

We are refurbishing a...

Last reply: Tristan Roberts, Feb 17, 2012, 3:20 pm

basement level with outdoor terrace for roof?

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Erica Downs on Jan 23, 2012, 8:54 pm

We have basement level rooms that extend beyond the above-grade building footprint. Effectively, the terrace serves as the roof for these below-grade rooms. If the terrace will remain untouched...

Last reply: Tristan Roberts, Feb 17, 2012, 2:51 pm