Documentation for demonstrating the sanitary fixtures flow rateCS-2009 WEp1: Water Use Reductionposted by Caroline Ma on Oct 27, 2011, 11:34 pm
Regarding the documentation to demonstrate the sanitary fixtures flow rate, can we submit a test report conducted on-site which can demonstrate the exact flow rate of the sanitary fixtures in our... Last reply: Nadia Ayala, Feb 20, 2012, 12:39 pm |
|
Paint Stripper?NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Ellen Mitchell on Feb 20, 2012, 9:16 am
I have a contractor submittal asking if paint stripper/ remover should be included in this credit and I'm not sure how to answer. In reviewing the credit requirements and... Last reply: Ellen Mitchell, Feb 20, 2012, 12:18 pm |
|
paint pasteNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Dario Ibarguengoitia on Feb 7, 2012, 5:13 pm
Which category should paint paste fall under? Last reply: Mara Baum, Feb 20, 2012, 12:00 pm |
|
LEED HC project with a basement-connected CUP buildingGeneral forumsposted by James Chueh on Jan 18, 2012, 2:11 am
We are doing a HC project that has two visually separate buildings, main clinic building and a CUP building, but these two buildings' basements are connected. We are thinking using... Last reply: Scott Bowman, Feb 20, 2012, 11:58 am |
|
Aerosol Coating Product (Spray Paint?)NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by John-David Hutchison, LEED AP BD+C, PMP on Feb 10, 2012, 2:41 pm
Has anyone found a definitive limit for spray paint - contractors often wonder what to use for marking paints. Last reply: Mara Baum, Feb 20, 2012, 11:50 am |
|
Interactive & Touch-Screen DisplaysCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Carly Ruggieri on Feb 17, 2012, 4:06 pm
A project of mine will be installing 70" interactive touch-screen wall mounted displays and tabletop (literally a screen with table legs) displays. The specified equipment is not ENERGY STAR, but... Last reply: Carly Ruggieri, Feb 20, 2012, 9:33 am |
|
Interior lightingCS-2009 SSc8: Light Pollution Reductionposted by Caroline Ma on Feb 20, 2012, 5:20 am
In our project, the interior lighting wiring is under tenant scope of work, however the provision of luminaires are under the project scope. So, do we still need to consider the interior lighting... |
|
LEED for Homes Only?Pilot-Credits PC9: Street Networkposted by Brooks Critchfield on Feb 18, 2012, 3:03 pm
Just to be clear--this is NO LONGER available to pursue as an ID Credit under LEED-NC v2009?? Thank you! Last reply: Michael Miller, Feb 19, 2012, 11:44 pm |
|
Pilot credit documentationPilot-Credits PC9: Street Networkposted by Michael Miller on Oct 19, 2010, 11:32 am
The pilot credit instructions say: "3. Submit feedback survey; supply PDF of your survey/confirmation of completion with credit documentation." When I completed the survey, it told me... Last reply: Matthew Fortin, Feb 19, 2012, 8:21 pm |
|
Why isn't it working this week?Living with LEED Online - quirks, bugs and hiccupsposted by Maura Adams on Feb 2, 2012, 11:56 am
I haven't been able to download any forms from the Scorecard all week. Usually it's slow but reliable. Anyone else experiencing this? Last reply: Nicolas Galiotto, Feb 19, 2012, 4:41 pm |