Re: Additional Building Added in Middle of Project

General forums
posted by David Posada on Aug 9, 2010, 8:50 pm

You may possibly be able to exclude this second building from the certifcation scope, but you'll want to look carefully at the MPR Supplemental Guidance document for MPR # 3, Site Boundary on...

Last reply: Tristan Roberts, Aug 10, 2010, 12:32 pm

Help with Interpretation!

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Robin Bass on Mar 4, 2010, 2:03 pm

Hello LEED Community at large. . .

My mechanical engineer is interpreting this Prereq. based on the LEED Reference Guide for ID&C which states on page 148 under Section 4....

Last reply: Tristan Roberts, Aug 10, 2010, 12:26 pm

Gas / fire suppressant

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Vivian Wan on Jul 22, 2010, 12:19 am

LEED Reference Guide states on p.148 under Section 4. Implementation, ". . .only HVAC systems built for the project are within the scope of work." but on p.150 under Section 11. Operations and...

Last reply: Tristan Roberts, Aug 10, 2010, 12:20 pm

Spray Foam Insulation

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Meredith Hunt on Aug 10, 2010, 10:23 am

I am working on a renovation of an existing building and we plan to furr out the interior side of the exterior walls to add spray foam insulation. Does the spray foam insulation fall under any...

Last reply: Tristan Roberts, Aug 10, 2010, 10:37 am

Emergency lighting

CI-2009 EAp2: Minimum Energy Performance
posted by Vivian Wan on Aug 9, 2010, 11:36 pm

May I know if...

Last reply: Paul Conrad, Aug 10, 2010, 8:47 am

Help on filling out LEED online template

NC-2009 EAc1: Optimize Energy Performance
posted by Mike Liu on Aug 4, 2010, 4:06 am

I am filling the LEED online template for EA p2, and I face a problem. Now I can get the building unmet load hours from eQUEST BEPS report, but I don't know how to split the heating unmet load...

Last reply: Christopher Schaffner, Aug 9, 2010, 8:28 pm

Does a BAS qualify?

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Matthew Macko on Mar 7, 2010, 7:04 pm

Would a building automation system qualify as the submetering system if it could track energy consumption by end-use?

Last reply: Christopher Schaffner, Aug 9, 2010, 8:27 pm

EPA's Target Finder Rating tool

Schools-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Aug 4, 2010, 7:48 am

Dear all,

I would like to inquire more about the Target Finder Rating tool. Assuming I entered the consumption values and all input parameters, I will generate an energy performance rating...

Last reply: Christopher Schaffner, Aug 9, 2010, 8:23 pm

Exterior Building Lighting Power calculation

CS-2009 EAp2: Minimum Energy Performance
posted by Adriana Hansen on Aug 5, 2010, 1:48 pm

Hello,

I am going to certify a shopping center and I have two questions:

1) Its façade uses recessed volumes to create movement and interesting angles, interposing façade panels at...

Last reply: Christopher Schaffner, Aug 9, 2010, 8:12 pm

Useful information regarding the issues with this credit...

NC-2009 EAc5: Measurement and Verification
posted by Michael Wymant on Jun 23, 2010, 2:39 pm
Last reply: Carey Paul, Aug 9, 2010, 6:56 pm