Topic | Recent |
---|---|
WEc2 FormEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Rachael McClain on May 6, 2010, 3:30 pm
I'm having problems with the WEc2 form, I can't enter any numbers in to the form where it has zeros. Do you have to complete the WEp1 form before that form becomes active? Last reply: Paul C, Sep 20, 2010, 9:43 am |
|
Uploading Phase II ESA report- where?Schools-2009 SSp2: Environmental Site Assessmentposted by Renee Shirey on Sep 17, 2010, 4:25 pm
In the online template, when I select the Option for utilizing a Phase II ESA report, it prompts me to upload info from the Phase II report. However, when I go to upload the document, it does... Last reply: Renee Shirey, Sep 17, 2010, 5:17 pm |
|
Commercial FaucetsCI-2009 WEc1: Water Use Reductionposted by Zachary Tetreault on Sep 17, 2010, 4:47 pm
The project is one floor in an existing office building. The only bathroom contains one toilet and one faucet. Would the faucet be considered private, similar to a hotel room, or commercial as it... Last reply: Zachary Tetreault, Sep 17, 2010, 5:00 pm |
|
Utilizing scrap collector instead of a garbage disposalSchools-2009 WEc4: Process water use reductionposted by Renee Shirey on Sep 15, 2010, 10:28 am
Has anyone attempted to utilize a scrap collector when attempting WE4? It recirculates the water it uses, reducing supply water usage by 90% over traditional garbage disposals. It would then... Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Sep 17, 2010, 3:44 pm |
|
Pricing- ToolkitEBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by Paul C on Sep 17, 2010, 10:31 am
The pricing document in the toolkit does not provide any pricing numbers. I am just trying to get a feel or what costs are in order to achieve this credit. Thanks. Last reply: Tristan Roberts, Sep 17, 2010, 1:09 pm |
|
Glass Fiber Reinforced ConcreteNC-2009 MRc5: Regional Materialsposted by Linda Davisson on Sep 17, 2010, 9:38 am
I'm looking for GFRC that is manufactured and extracted from within 500 miles of the DC metro area. I tried using the website mrgreenpoints.com but it only gave one local manufacturer. It's so... |
|
Non-centralised AC for office towerCS-2009 EAp2: Minimum Energy Performanceposted by Edwin Wealend on Sep 8, 2010, 12:25 am
HI, We are working on a small soho office tower, about 28 floors tall with a GFA of around 20000m2. We want to use split type or VRV AC unit for the offices instead of doing a full blown... Last reply: Edwin Wealend, Sep 16, 2010, 7:44 pm |
|
Minimum distance between smoking room exhaust and windowsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Maya Karkour on Sep 14, 2010, 10:06 am
Hello, Under option 2 of this credit, the LEED Guidance states that: "At a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes and building entry... Last reply: Tristan Roberts, Sep 16, 2010, 5:47 pm |
|
HERS RaterNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by David Herrera on Sep 13, 2010, 1:33 pm
Hello, I wanted to ask if I perform a Door Blower Test with a HERS Rater will it be acceptable by the USGBC to comply with my... Last reply: Tristan Roberts, Sep 16, 2010, 5:44 pm |
|
IAQP1EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Rafael Negron on Jul 13, 2010, 11:35 am
We are working with a very large commercial building with many tenants and pursuing LEED... Last reply: Jenny Carney, Sep 16, 2010, 5:39 pm |