Topic | Recent |
---|---|
Meeting 62.1 requirementsCS-2009 IEQp1: Minimum indoor air quality performanceposted by javier bolanos zeledon on Nov 7, 2010, 8:28 pm
According to 5.10.1 you should have a relative humidity of no more than 65%. And you have to analyze this with outdoor air at humidification design conditions (design dew point and mean... Last reply: javier bolanos zeledon, Dec 2, 2010, 10:54 pm |
|
Occupant Number for Systems Design vs LEED CreditsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Terry Gorski on Nov 4, 2010, 12:34 pm
For a major renovation project, is it acceptable to use a much larger occupant number for the HVAC systems design and number of fixtures based on usable square footage and then use the much... Last reply: Roger Chang, Dec 2, 2010, 8:57 pm |
|
Complying with 62.1 in an Undergroung GarageNC-2009 IEQp1: Minimum indoor air quality performanceposted by Patrik Lazzari on Oct 22, 2010, 5:46 pm
I’m helping out a project team in Italy with their LEED project. This is a mid-rise residential building that has a 2-story underground parking garage. It has, besides the main entrances (... Last reply: Roger Chang, Dec 2, 2010, 8:49 pm |
|
Using Option 4NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Deborah Lucking on Dec 1, 2010, 8:05 pm
Requesting some guidance in submitting for this credit using Option 4... Last reply: David Posada, Dec 2, 2010, 7:10 pm |
|
Fenestration and doors leakageCS-2009 EAp2: Minimum Energy Performanceposted by javier bolanos zeledon on Dec 1, 2010, 3:10 pm
According to Ashrae 90.1 5.4.3.2 air leakage for fenestration and doors shall be determined in accordance with... Last reply: javier bolanos zeledon, Dec 2, 2010, 12:04 pm |
|
Option 2 prescriptiveCS-2009 IEQc8.1: Daylight and views - daylightposted by Sofia Nordström on Nov 19, 2010, 4:17 am
Hi, I’m working with a CS project and we have chosen to go for Option 2, the prescriptive path. My issue is that the project consists of an 8 story square building with a large skylight and... Last reply: Eddy Santosa, Dec 1, 2010, 9:12 pm |
|
Location of hardscape areasNC-2009 SSc5.2: Site development - maximize open spaceposted by Laurie Hammack on Dec 1, 2010, 7:34 pm
In reading the wording for this credit under 2009 NC, it mentions for all cases that "projects in urban areas that earn SS Credit 2: Development Density and Community Connectivity, pedestrian-... Last reply: Devon Bertram, Dec 1, 2010, 7:55 pm |
|
Same here. Its been about 15General forumsposted by Patrick Jones on Dec 1, 2010, 2:02 pm
Same here. Its been about 15 minutes for me and don't see a confirmation email yet. Last reply: Batya Metalitz, Dec 1, 2010, 2:24 pm |
|
Pedestrian Access by Residential AreaCS-2009 SSc2: Development Density and Community Connectivityposted by Karla Fisk on Nov 19, 2010, 9:12 am
In using Option 2 - Community Connectivity, must the residential area have unimpeded pedestrian access to the project, as well as the project having unimpeded pedestrian access to the 10 basic... Last reply: Karla Fisk, Dec 1, 2010, 2:04 pm |
|
Intersection countingPilot-Credits PC9: Street Networkposted by Benoit Tesch on Oct 28, 2010, 11:52 am
I am not sure sure how to count the intersection. Our building is located in a high... Last reply: Batya Metalitz, Dec 1, 2010, 1:52 pm |