Combined Sewer AreasPilot-Credits WEpc10: Sustainable wastewater managementposted by Scott Durbin on May 4, 2011, 5:29 pm
In areas with combined sewers, could option 1 be achieved by reducing runoff volume to the sewer? Last reply: Karen Poff, May 5, 2011, 6:14 pm |
|
LZ3 commentNC-2009 SSc8: Light Pollution Reductionposted by James Weingarten on May 5, 2011, 4:52 pm
This may stretch a bit outside the LEEDuser realm, but...... I received a comment on a past project, where the reviewer wanted verification that the project was actually a LZ3 as defined... |
|
LEED CS & LEED CI- PV arrayCS-2009 EAc1: Optimize Energy Performanceposted by S. Sachs on May 5, 2011, 2:43 pm
Hi, I am working on a LEED CS project, at the same time the tenant is pursuing LEED CI (separate submission) and planning to install a PV array to achieve the 2.5% of building electricty... Last reply: Christopher Schaffner, May 5, 2011, 4:27 pm |
|
LEED CI- Retail: IEQ4.6, Ceiling and Wall SystemsGeneral forumsposted by Melissa Wrolstad on May 5, 2011, 3:50 pm
Is it acceptable to use Greenguard certified products to meet the requirements of this credit? The credit requires products to meet the California Department of Health Services Standard... |
|
Estimated crown diameterPilot-Credits PC14: Walkable Streetsposted by Christina Lynch on Mar 22, 2011, 9:13 am
Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks! Last reply: Chris Marshall, May 5, 2011, 3:44 pm |
|
Unirrigated areas in Option 1NC-2009 WEc1: Water Efficient Landscapingposted by Eamon Geary on Apr 8, 2011, 11:04 am
Hello, Last reply: Erica Downs, May 5, 2011, 2:38 pm |
|
ETS and Ventilation Requirements for Residential ProjectsNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Rick Gehrke on Sep 17, 2010, 1:51 pm
Case 1, Option 2 states that at a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes and building entry paths, with no recirculation of... Last reply: Susann Geithner, May 5, 2011, 1:08 pm |
|
WE p1/C3 in Core & ShellNC-2009 WEc3: Water Use Reductionposted by Anu Sumanth on May 4, 2011, 3:49 pm
If all the plumbing fixtures are to be installed in future by tenant, and if I check Tenant Neutral for WE p1; I will not be able to achieve the prereq. 20%. Is this typical? Last reply: Susann Geithner, May 5, 2011, 12:53 pm |
|
80% adoption for CaGBC usersEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Emma Sanborn on May 5, 2011, 11:54 am
Note to any CaGBC users: CaGBC doesn't mention a 20% minimum anywhere in SS c2. It mentions demonstration that best practices were used to a "significant degree...at least 80% of the time." I've... |
|
Water filtrationCS-2009 SSp1: Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on May 5, 2011, 11:36 am
How much filtration is required when discharging rainwater that contains suspended solids? We have some rainwater acumulation and we would like to know if a simple screening will be enough... |