District heating pricesNC-v4 EAp2: Minimum Energy Performanceposted by Azra on Sep 13, 2023, 5:59 am
Hello, Last reply: Azra, Oct 25, 2023, 9:10 am |
|
LEED ACP for District Energy (PEER) for ID+C?CI-v4 EAp2: Minimum Energy Performanceposted by Brian Salazar on Oct 10, 2023, 1:43 pm
Hello! We are working on a stand-alone building interior, ... Last reply: Tyler Thumma, Oct 25, 2023, 8:28 am |
|
Integrative Analysis of Building Materials-- International ProjectsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Marina Rullo on Oct 24, 2023, 12:39 pm
We have attempted this pilot credit as a US-based company for a project that is in the UK. Does anyone have experience with doing the Integrative Analysis Matrix for non-US products? We found it... Last reply: Azra, Oct 25, 2023, 12:53 am |
|
single or multi-zone?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Guilherme Ramos on Mar 7, 2013, 11:27 am
Our building is fully occupied by the same company, so all the floors have similar open space layout, except for enclosed managers or small meeting rooms. There´s an outside air intake in... Last reply: Dave Hubka, Oct 24, 2023, 10:55 am |
|
Thermal Comfort Control for Individual SpacesCI-v4.1 EQc5: Thermal comfortposted by Yamona Segar on Oct 23, 2023, 11:01 pm
In our open office space, we utilize a centralized AC system controlled by the landlord, and they allow for setpoint adjustments upon staff request for thermal comfort control. However, USGBC did... |
|
Light Pollution Prevention during construction (internally illuminated signage)CS-v4 SSc6: Light Pollution Reductionposted by Marine Petrosyan on Oct 23, 2023, 2:05 am
Hi All! The project owner wants to place internally illuminated signage on the wing of the top of the lifting crane during the construction. I understand this should be regulated under "... Last reply: Marine Petrosyan, Oct 23, 2023, 10:11 am |
|
Rainfall data taken from AQUASTAT (annual by country), how to calculate?CS-v4 SSc4: Rainwater managementposted by Marine Petrosyan on Oct 19, 2023, 9:31 am
Hi, All! The daily rainfall data is not available four our project in our country. We chose to check the Aquastat data, which gives only one average annual number, 562mm. QUESTION:... |
|
Distribution uniformity different from defaultNC-v4 WEc1: Outdoor water use reductionposted by Ricardo Sá on Oct 1, 2018, 10:44 am
Hi, does anyone know if it is possible to claim water savings whenever real irrigation systems have distribution uniformity (DU) higher than the LEED default (e.g. Rotor with DU=80%,... Last reply: Gustavo De las Heras Izquierdo, Oct 18, 2023, 9:42 pm |
|
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%NC-v4 WEc1: Outdoor water use reductionposted by Jing Zhang on Oct 19, 2016, 5:34 pm
Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.... Last reply: Gustavo De las Heras Izquierdo, Oct 18, 2023, 9:36 pm |
|
Indoor planters and landscapeNC-v4 WEc1: Outdoor water use reductionposted by Ricardo Sá on Jul 8, 2020, 10:17 am
Dear All, we’re currently working on a LEED certification of a new building located in a site including outdoor landscaped areas. The building itself also has indoor planters and... Last reply: Gustavo De las Heras Izquierdo, Oct 18, 2023, 9:22 pm |