Log in
Forum
Topic

Percentage of finished floor complying for the credit

Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
posted by Dario Ibarguengoitia on Jul 7, 2011, 2:27 pm

MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?
IM AM NOT CLEAR ABOUT THE PERCENTAGE OF THE...

Last reply: Kate Randolph, Jul 24, 2011, 12:40 am

what happens when verification turns up changes?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Tristan Roberts on Jul 20, 2011, 2:33 pm

It's a requirement for EAp1 that the...

Last reply: Susann Geithner, Jul 22, 2011, 5:53 pm

Building Over Hang

CI-2009 EAp2: Minimum Energy Performance
posted by Simon Sue on Jul 13, 2011, 9:20 pm

We working on a commercial bank and calculating the installed...

Last reply: Susann Geithner, Jul 22, 2011, 5:00 pm

SIMULATION METHOD

CS-2009 EAp2: Minimum Energy Performance
posted by RICARDO GUEMEZ DIAZ on Jul 22, 2011, 2:22 pm

HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE....

Last reply: Susann Geithner, Jul 22, 2011, 4:43 pm

Permeable or Mulched Paths in Calculations

NC-2009 WEc1: Water Efficient Landscaping
posted by Terry Gorski on Jun 30, 2011, 3:36 pm

How would permeable or mulched paths be shown in the LEED Online form calculations? Would they still be considered landscaping, and not irrigated, and left in the calculations? If some of the...

Last reply: Susann Geithner, Jul 22, 2011, 3:51 pm

Non Potable Municiply Provided Well Water

NC-2009 WEc1: Water Efficient Landscaping
posted by Sam Keehn on Apr 12, 2011, 3:34 am

There is municiply provided water available, called raw water which, as per the standard has less than 5,000 mg/l of Total Disolved Solids. The problem is that this is well water (but drawn on a...

Last reply: Susann Geithner, Jul 22, 2011, 3:23 pm

ASHRAE 62.1 MZ calculator acceptable alternative documentation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Courtney Yan on Apr 1, 2011, 2:01 pm

We are working on fixing the built-in calculator for IEQp1/c2. Project teams may provide their own support calculations documentation or use the ASHRAE 62MZCalc spreadsheet to demonstrate credit...

Last reply: Courtney Yan, Jul 22, 2011, 2:35 pm

Energy Star Rated Equipment

CI-2009 EAp2: Minimum Energy Performance
posted by Alex Spilger on Jul 22, 2011, 1:50 pm

In regards to products that are included in this calculation, would a projector be included?

ACP for MRc1.1,4,5?

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Nathan Lee on Jul 13, 2011, 4:20 am

I know this is probably the most basic of questions, so please bear with me.

I am trying to figure out the application of points for PC1 and if it is an ACP for the MR credits listed above...

Last reply: Nathan Lee, Jul 22, 2011, 8:26 am

FSC, assemblies and recent addenda

NC-2009 MRc7: Certified Wood
posted by Steve Loppnow on Mar 3, 2011, 5:11 pm

We are working with a flooring product that is manufactured with an...

Last reply: Judy Landwehr, Jul 21, 2011, 4:58 pm