Topic | Recent |
---|---|
ID Credit for 100% Outside air?NC-2009 IDc1: Innovation in Designposted by Nelina Loiselle on Aug 12, 2011, 3:46 pm
Has anyone tried pursuing an ID credit for using 100% outside air in the building's HVAC systems? Last reply: Robert Phinney, Aug 12, 2011, 5:12 pm |
|
Window ReplacementPilot-Credits PC19: Whole Building Reuseposted by Patrick Castelvecchi on Aug 11, 2011, 3:47 pm
One thing to consider by requiring project teams to include windows in the calculation is areas where the exisitng windows cannot physically be retrofitted to meet the new performance criteria.... Last reply: Sarah Buffaloe, Aug 12, 2011, 4:18 pm |
|
Sidewalk definitionPilot-Credits PC14: Walkable Streetsposted by Jens Apel on Aug 10, 2011, 7:34 am
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. Last reply: Chris Marshall, Aug 12, 2011, 12:54 pm |
|
Treating and Reusing Process Waste WaterPilot-Credits WEpc10: Sustainable wastewater managementposted by Prudence Ferreira on Jul 21, 2011, 4:30 pm
In an existing winery facility we are capturing 100% of our process wastewater (which is significant) and treating it onsite in aerated retention ponds, then using it for vineyard irrigation.... Last reply: Karen Poff, Aug 12, 2011, 12:05 pm |
|
EA Cr-1- Process Energy Cost less than 25%Schools-2009 EAc1: Optimize Energy Performanceposted by April McGee-Flournoy on Aug 12, 2011, 10:05 am
Project K-12 school, The enegry calculation done for the entire building but the process enegry cost comes less than 25%. What is the next step should I provide the supporting documents... Last reply: Marcus Sheffer, Aug 12, 2011, 11:38 am |
|
zone floor areaNC-2009 IEQc8.1: Daylight and views - daylightposted by Traci Stotts on Mar 24, 2011, 4:36 pm
Is the 'zone floor area' in the prescriptive calcs bascially just the area on the floor plan that is determined by the width of the window x twice the height? Can I not include any area that is... Last reply: Jean Marais, Aug 12, 2011, 11:35 am |
|
IEQc8.2_Views for Exemplary Performance- DocumentationCI-2009 IEQc8.2: Daylight and views - viewsposted by Gail von Staden on Apr 8, 2011, 10:10 am
Dear Leeduser Forum :-) I'm working on a commercial interiors project that I hope can acheive the EP points. But, I'm still not sure about some of the criteria descriptions and how to... Last reply: Lauren Fakhoury, Aug 12, 2011, 9:08 am |
|
Multiple Innovation Points for Green CleaningNC-2009 IDc1: Innovation in Designposted by Jennifer Wehling on May 11, 2011, 1:01 pm
Our Team is working on a project under NC 2009. In the past we have been awarded an innovation point for a green housekeeping program. But I am wondering, using Path 1 to borrow credits from... Last reply: Erica Downs, Aug 11, 2011, 4:40 pm |
|
Eco-Healthy Child Care InitiativeNC-2009 IDc1: Innovation in Designposted by Linda Davisson on Feb 17, 2011, 9:43 am
In case anyone is designing a child care facility, our team for the FDA Child Care Center recently achieved an ID credit for committing to the Eco-Healthy Child Care Initiative. If anyone is... Last reply: Elizabeth Powers, Aug 11, 2011, 4:20 pm |
|
Entrance lobby as live-work spacePilot-Credits PC14: Walkable Streetsposted by Jens Apel on Aug 10, 2011, 7:30 am
In my project there is a main entrance lobby that includes a permanently manned reception. Would that count as live-work space for category "Ground-Level Use and Parking" option h? Last reply: Chris Marshall, Aug 11, 2011, 2:29 pm |