Building footprint

CS-2009 SSc5.1: Site development - protect or restore habitat
posted by Albert Tappe on May 15, 2011, 4:44 pm

Our project is an office tower connected to a large 4 level car park with a public plaza on top and retail at the perimeter on ground level. I understand the exclusion of surface parking from the...

Last reply: Devon Bertram, Jul 27, 2011, 7:25 pm

Bldg Footprint_Cooling Tower & Generator

CS-2009 SSc5.1: Site development - protect or restore habitat
posted by Nancy Goshow on Jul 6, 2011, 10:19 am

We have a cooling tower and emergency generator adjacent to our building that is on a concrete pad and surrounded by a screen...

Last reply: Devon Bertram, Jul 27, 2011, 7:00 pm

LEED baseline showerhead fixture for onsite tests

NC-2009 WEc3: Water Use Reduction
posted by Nicolas Galiotto on Jun 9, 2011, 9:09 am

Hi all,

We are planning to run some onsite tests to determine how water efficient are our showerheads. Since the 80 psi water pressure referenced within the EPA 1992 is not relevant for...

Last reply: Devon Bertram, Jul 27, 2011, 6:38 pm

Transient Calcs for Residential Occupancy within Mixed-Use Dev.

NC-2009 WEc3: Water Use Reduction
posted by William Weaver on Jun 14, 2011, 1:59 pm

I was wondering if anyone could provide guidance for calculating the transients for the residential component of a mixed use facility? We are working on a multi-story mixed-use development that...

Last reply: Devon Bertram, Jul 27, 2011, 6:23 pm

Ground-Mounted Solar PV Arrays

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by J Douglas Dietrich on Jul 1, 2011, 3:45 pm

If there is an open space with (1) a ground-mounted solar PV array and (2)native plantings or adapted vegetation beneath the PV panels and around them so as not to block sunlight, would the area...

Last reply: Devon Bertram, Jul 27, 2011, 5:50 pm

Very good presentation,

General forums
posted by Nelina Loiselle on Jul 27, 2011, 3:54 pm

Very good presentation, however I can not find the "Opt In" option on my...

Last reply: Josh Mauldin, Jul 27, 2011, 5:40 pm

Landscape irrigation baseline in California

NC-2009 WEc1: Water Efficient Landscaping
posted by Brightworks Sustainability on Jul 26, 2011, 5:25 pm

With the new state wide green building code and local municipal requirements for landscape irrigation, how is a baseline developed when regional requirements now approach what was a 50% reduction...

Last reply: Susann Geithner, Jul 27, 2011, 3:36 pm

Steel structure enamel

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by javier bolanos zeledon on Jun 16, 2011, 12:02 pm

Hi, this is a retrofit of an existing building where all the exterior structural walls are being replaced and also the interior walls. At this point in construction there are no exterior or...

Last reply: Michael Miller, Jul 27, 2011, 2:33 pm

SSc4 EBOM v2.2

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Sheryl Swartzle on Jul 12, 2011, 11:11 am

Our project is 750,000 sf office with 1277 occupants. Project is located in Miami and has it's own parking garage. Can we use garage swipe card documentation in place of a survey to determine...

Last reply: Ashley Lomel, Jul 27, 2011, 9:43 am

Public Street Lights and Municipal Dark Sky Policy

NC-2009 SSc8: Light Pollution Reduction
posted by Lauren Ford on Jul 27, 2011, 9:13 am

Our project is on an Urban site bordered by Public right of way on all sides. The property line that we will use as a Project Boundary is several feet outside the curb line. We are required by...