lighting for comfortNC-2009 SSc8: Light Pollution Reductionposted by Jaida Anderson-Lozano on Oct 26, 2011, 3:58 am
How does this credit take into consideration lighting for comfort? Can there be exceptions that are beyond ASHRAE 90.1 Section 9.4.5? Also Section 9.4.5 says "temporary lighting", could... |
|
Energy Star Portfolio Manager NamingNC-2009 EAc5: Measurement and Verificationposted by April Ambrose on Aug 11, 2011, 4:01 pm
PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name. Projects must also include their LEED project identification number in the notes portion... Last reply: Marcus Sheffer, Oct 25, 2011, 3:09 pm |
|
Recertification of EBOM projectLEED Recertification: When and Howposted by Sheryl Swartzle on Oct 24, 2011, 10:13 pm
We received initial ... Last reply: Barry Giles, Oct 25, 2011, 2:21 pm |
|
Rainwater Collection?General forumsposted by Scott Bowman on Oct 25, 2011, 12:56 pm
I probably should have looked into this sooner, but am preparing for a presentation related to a rainwater collection and... |
|
baseline for northern countriesNC-2009 WEc1: Water Efficient Landscapingposted by Eszter Gulacsy on Oct 19, 2011, 10:33 am
We have a project in Scandinavia, where there are no local authority requirements about landscaping. The site is industrial in a rural location. The typical landscape planting is pretty much to... Last reply: Susann Geithner, Oct 25, 2011, 12:13 pm |
|
Alternative Sources of WaterNC-2009 WEc1: Water Efficient Landscapingposted by Omer Moltay on Oct 24, 2011, 4:59 pm
Can the following types of water, if stored in a rainwater cistern, contribute to credit compliance? - Water from building foundations (dewatering) pumped into the rainwater cistern,... Last reply: Susann Geithner, Oct 25, 2011, 12:06 pm |
|
Option 3- Whole Building Reporting / Energy Star PMNC-2009 EAc5: Measurement and Verificationposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Oct 25, 2011, 10:58 am
Energy Star Portfolio Manager does not cover all building types. Were a building to not fall into an Energy Star category, is it allowed to simply report the whole building energy and water use... Last reply: Marcus Sheffer, Oct 25, 2011, 11:35 am |
|
M&V plan- Option D vs. Energy StandardNC-2009 EAc5: Measurement and Verificationposted by André Knutsson on Oct 24, 2011, 2:32 am
Our LEED project is situated in Norway. We had to run energy simulations after ASHRAE 90.1-2007 for LEED purposes. However the "real" energy simulations for the building is run after NS3031:2007... Last reply: André Knutsson, Oct 25, 2011, 1:31 am |
|
non default occupancy valuesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Janika McFeely on Oct 21, 2011, 11:56 am
I received a comment on a review that the occupancies used for EQp1 did not meet the peak occupancy listed on PF3. I have always assumed these as separate issues and argued that we used ASHRAE... Last reply: Emily Catacchio, Oct 24, 2011, 5:23 pm |
|
zoning requirement split 30% and 95%NC-2009 SSc5.2: Site development - maximize open spaceposted by Edwin Wealend on Jun 8, 2011, 10:02 am
Hi we have a site whereby our LEED boundary includes two separately zoned areas and one is zoned for buildings with 30% open space required by local planners. The second space equivalent to the... Last reply: Devon Bertram, Oct 24, 2011, 5:14 pm |