Log in
Forum
Topic

VOC content documents

NC-v4.1 EQc2: Low-emitting materials
posted by Subhashkumar A on Sep 4, 2023, 12:51 pm

To achieve the Low Emitting Material credit, we submitted thresholds for furniture, ceiling, flooring, paints & coatings, and adhesives &...

Last reply: Renee Shirey, Sep 5, 2023, 8:01 am

WaterSense Tool availability?

CS-v4 WEp1: Outdoor water use reduction
posted by Marine Petrosyan on Sep 4, 2023, 6:43 am

Lighting Zone definition according to MLO for ASHRAE compliance

NC-2009 SSc8: Light Pollution Reduction
posted by LEED Pro Consultant on Jul 8, 2015, 12:05 pm

We are developing a high rise multi-residential project (5 buildings) in a undeveloped land, the area is between the access to a national park and multiple neighborhood (residential units). The...

Last reply: Marine Petrosyan, Sep 4, 2023, 5:19 am

Electric vehicles charging stations

CS-v4 EAc2: Optimize Energy Performance
posted by Rihab Joucht on Aug 25, 2023, 8:56 am

I want to make sure if we include the EV charging in Energy Model ? As mentionned in 10499 - EV Charging in Model | U.S. Green Building Council (...

Last reply: Marcus Sheffer, Sep 1, 2023, 1:35 pm

EPD Option 2: Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Jane Rohde on Sep 1, 2023, 12:57 pm

For this portion of the credit, the Baseline Documentation includes Industry Wide Type III EPDs

Reduction in Embodied Carbon
▪10% or greater reduction in Global...

Interpreting "medical intervention" and "direct medical care"

Healthcare-v4 SSc7: Places of respite
posted by on Sep 1, 2023, 10:44 am

We are working on a Mental Health facility and we are curiosus about how to interpert "medical intervention" and "direct medical care: "The area is located where no medical intervention...

VOC content for Insulation foam rolls with self adhesive.

NC-v4.1 EQc2: Low-emitting materials
posted by Ngo Ha on Dec 16, 2020, 4:33 am

Hi All,
I am currently working on 1 certified LEED project.
the contractor/Supplier submitted Plastic and Rubber Insulation rolls with self-adhesive. (All these coating processes has...

Last reply: Ralph Bicknese, Sep 1, 2023, 11:04 am

Light Pollution for Large Project Boundaries

Warehouses-EBOM-v4.1 SSc3: Light Pollution Reduction
posted by Rick Fox on Aug 18, 2023, 10:31 am

I manage a 550k square foot warehouse operating at 24/7.  All of our building lights, are LED and point down at the ground.   Our pole lights are LED also and point down at a 45 degree angle to...

Last reply: Bill Swanson, Sep 1, 2023, 8:57 am

Location of short-term bicycle parkings

CS-v4 LTc6: Bicycle facilities
posted by Marine Petrosyan on Sep 1, 2023, 8:25 am

Hi, All!

The architect has designed a great part of the short-term bicycle parkings inside the building, mostly in the territory of car parkings, which form the underground floors of the...

Demand Response- Switch credit to LEED v4.1

NC-v4 EAc4: Demand response
posted by Caterina Panteghini on Aug 31, 2023, 11:51 am

Hello, everyone.

I have a question about...

Last reply: Marcus Sheffer, Aug 31, 2023, 4:43 pm