Topic | Recent |
---|---|
Energy and AtmosphereLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:15 pm
Adding PV panels to an existing building can impact the fire performance of the existing roof... |
|
Enhanced Resilient site designLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 1:59 pm
I am thrilled to have wildfire part of this credit but the text provided is not very clear and also not up to date in some of its references. I suggest the following wording to make it more clear... |
|
Location and transportationLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:12 pm
Add the need for a fire safety review of charge points if these are within or directly adjacent to the building. |
|
Operational Planning and Response for ResilienceLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:10 pm
Missing that the emergency response plan should be communicated to the local fire department. |
|
Resilient spacesLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:05 pm
Add wildfires to the list in Option 5. |
|
Enhanced Building AccessibilityLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:03 pm
Would be great to add that emergency exits are designed to account for X number of people with physical disabilities. Often exit design has not taken this into account. It fits with the need for... |
|
GHG Emission parametersNC-v4 EAp2: Minimum Energy Performanceposted by A&L SUSTENTABILIDADE on May 3, 2024, 4:02 pm
I have some questions regarding greenhouse gas (... Last reply: Victor Catrib, May 7, 2024, 11:26 am |
|
Baseline system type for project that will retain part of an existing HVAC systemNC-v4 EAp2: Minimum Energy Performanceposted by Camilo Velez on May 4, 2024, 12:16 pm
Hi all, We are working on an existing small project (35,000 SF approx) that is going through a major renovation, where most of its systems are being updated, including new AHUs, however,... Last reply: Tyler Thumma, May 7, 2024, 8:34 am |
|
Tips for selecting product categories:NC-v4.1 EQc2: Low-emitting materialsposted by Marcelo Alencar Pereira on May 6, 2024, 4:34 pm
What are your opinions on the four product categories that are most conducive to obtaining LEED EQ Credit: Low Emitting Materials, in version 4.1 (BD+C)? Factors to consider include market... Last reply: Maria Porter, May 7, 2024, 2:34 am |
|
Need More attention to CleaningLEED v5 O&M Existing Buildings Public Commentsposted by Brian Rauch on May 6, 2024, 2:06 pm
The draft version of LEED v5 for existing buildings (1)undervalues cleaning in the weighting process, (2)eliminates the prerequisite for systems and worker training, and (3) does not provide a... |