Multiple Buildings in LEED-EB: O&MGeneral forumsposted by Chris Nixon on Feb 16, 2010, 7:44 am
You don't actually have to meter the water. You have to establish a baseline under WEp1, but don't need an individual meter for the building. To get WEc1 you need to meter the individual... |
|
The term "Registered" usuallyGeneral forumsposted by Jean Marais on Feb 16, 2010, 6:08 am
The term "Registered" usually refers to having registered with the national body representing the engineers of that country. Not all degree qualified engineers bother to register. You also... |
|
Thanks Chris, for yourGeneral forumsposted by D. G. on Feb 15, 2010, 9:09 pm
Thanks Chris, for your response. Sorry not to mention it more clearly, but I'm familiar with the requirement to meter the energy use of individual buildings - that's pretty clear in the existing... |
|
Average Daily TransientNC-2009 WEp1: Water Use Reductionposted by Hsin-Yi Hsieh on Feb 10, 2010, 11:37 am
Hi, Last reply: Mara Baum, Feb 15, 2010, 8:37 pm |
|
Hospital BaselineNC-2009 WEp1: Water Use Reductionposted by Benjamin Bryant on Aug 11, 2009, 6:35 pm
I'm trying to figure out a baseline water use for a hospital. Last reply: Mara Baum, Feb 15, 2010, 8:29 pm |
|
Multi-Family Residential ApplicationEBOM-2009 SSc4: Alternative Commuting Transportationposted by April Ambrose on Feb 15, 2010, 12:29 pm
At the beginning of the "Bird's Eye View" section the language used referencing the credit's intent states, in part, that its purpose is to "reduce the number of conventional commuting trips made... Last reply: Dan Ackerstein, Feb 15, 2010, 7:48 pm |
|
High rise residentialNC-2009 IEQp1: Minimum indoor air quality performanceposted by Joseph Blanco on Feb 15, 2010, 7:23 pm
I have a project that is a 8 story high residential high rise with no natural venilation and was built in the 70's and its located in Long Beach california so there was no HVAC system ever... Last reply: Tristan Roberts, Feb 15, 2010, 7:31 pm |
|
Fundamental/Enhanced Commissioning ScopeCI-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Chris Ladner on Feb 15, 2010, 6:40 pm
The... |
|
Maintenance equipment powered by natural gasEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Lauren Sparandara on Feb 11, 2010, 7:05 pm
Would equipment powered by natural gas qualify in lieu of electric-powered equipment, given emissions reduction over conventional gas powered equipment? Last reply: Shira Norman, Feb 15, 2010, 6:40 pm |
|
20% Adoption as a MinimumEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by April Ambrose on Feb 15, 2010, 12:22 pm
I can't find anywhere that the USGBC stipulates 20% adoption as a minimum. Would you direct me to your source so that I can add such language to our Plan if it indeed is a USGBC mandate? Last reply: Shira Norman, Feb 15, 2010, 6:13 pm |