Topic | Recent |
---|---|
No Green Products availableEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Chris Munn on Aug 19, 2010, 2:41 pm
I am working with a client that has automist dispensers for fly control near the building entrances. The dispensers are not LEED compliant, but apparently the pest control service claims there... Last reply: Tristan Roberts, Aug 20, 2010, 12:37 am |
|
Re: Telepresence systemsGeneral forumsposted by David Posada on Aug 19, 2010, 7:22 pm
Doubtful - check Last reply: Tristan Roberts, Aug 20, 2010, 12:04 am |
|
Option 3 Daylight MeasurementNC-2009 IEQc8.1: Daylight and views - daylightposted by Norma Lehman on Aug 17, 2010, 2:51 pm
we took readings on a 10'-0" grid as the "documentation toolkit" indicates. In some cases, our... Last reply: Jill Perry, PE, Aug 19, 2010, 7:23 pm |
|
Re: Parking GarageGeneral forumsposted by David Posada on Aug 19, 2010, 6:36 pm
It seems reasonable to exclude the garage from the project boundary and still use its spaces for SSc4.3 and 4.4. Version 2.2 was less prescriptive in stating how the site boundary was to be... |
|
Metered Energy UseNC-2009 EAc5: Measurement and Verificationposted by Rebecca Molldrem on Aug 9, 2010, 9:12 am
The credit requirements say, "The M&V period must cover at least 1 year of post-construction occupancy". This however, isn't saying that we can't complete this credit until one year after... Last reply: Marcus Sheffer, Aug 19, 2010, 4:41 pm |
|
Computer loadCS-2009 EAp2: Minimum Energy Performanceposted by Diana Wellenbrink on Aug 18, 2010, 11:11 pm
Should a computer be calculated as 400W or according to Energy star in our case 175 KWh/annual or around 80 W?: ref: http... Last reply: Christopher Schaffner, Aug 19, 2010, 8:05 am |
|
DES GuidanceGeneral forumsposted by Christopher Schaffner on Aug 18, 2010, 3:43 pm
One thing to look out for - while teams can now pick either Option 1 or Option 2, note that each options have point limitations. Under Option 1, projects can only earn a maximum of half the... |
|
Outdoor TrackSchools-2009 SSc7.1: Heat island effect - nonroofposted by Linda Davisson on Aug 18, 2010, 12:14 pm
Our school project has an outdoor track made of rubber. Is this considered a hardscape or can it count as open space? Thanks Last reply: David Posada, Aug 18, 2010, 12:28 pm |
|
Pressure of water supply for faucets/showerheadsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Yong Lee Low on Jul 27, 2010, 4:10 am
Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building... Last reply: Jenny Carney, Aug 18, 2010, 11:45 am |
|
Original Building ComplianceCI-2009 IEQc7.1: Thermal comfort - designposted by Jeremy Kuhre on Aug 12, 2010, 4:40 pm
I'm a little new to LEED CI (got my AP cred. in NC) and have had intermittent confusion on the scope of LEED CI certification. As I understand it, only work performed as part of the tenant fit-... Last reply: Jeremy Kuhre, Aug 18, 2010, 11:40 am |