Individual document uploads for LEED Online website

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by John Ida on Jul 26, 2010, 7:27 pm

The leed online v3 website shows separate file upload categories. If the mechanical engineer has provided the Sequence of Operations and the Systems Narrative as part of the...

Last reply: Jenny Carney, Jul 30, 2010, 1:09 pm

LEED Online- Protocol Tools or Calculators

EBOM-2009 EAc6: Emissions Reduction Reporting
posted by John Ida on Jul 13, 2010, 8:39 pm

The LEED Online template for EAc6 asks to "Upload completed protocol tools or calculators presenting data for building energy use emissions." in addition to the formal documentation from Energy...

Last reply: Jenny Carney, Jul 30, 2010, 1:02 pm

ASHRAE 62 done previously

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Richard Navarro on Jul 22, 2010, 2:04 pm

We have done an ASHRAE 62.1-2007 calculation back in September 2008, is it possible to submit that calculation if we intend to submit the end of our performance period as August 31st 2010.

...

Last reply: Jenny Carney, Jul 30, 2010, 12:53 pm

Tankless toilets, etc.

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Nadine Kotlarz on Jul 30, 2010, 12:30 pm

Our team is working through compliance option 4. Our building does not have any manufacturer cutsheets for the water closets or faucets. We need flow/flush rates for a 20% representative sample...

Last reply: Jenny Carney, Jul 30, 2010, 12:48 pm

Clean room project

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by javier bolanos zeledon on Jul 30, 2010, 12:13 am

How can I model a clean room project where there is a lot of non process load in the HVAC. Can I assume HVAC as process load since it is not just for human comfort and is also for having the...

Last reply: Paul Conrad, Jul 30, 2010, 12:28 pm

Fan Coil Units

EBOM-2009 EAc3.1: Performance measurement - building automation system
posted by Ashu Gupta on Jul 26, 2010, 12:53 am

We have 500 Fan coil units in our project but they are not on BMS. Chiller, boiler, AHUs and other HVAC units are on BMS. So my question is should we integrate the FCUs on BMS to achieve this...

Last reply: Pierce Holstrom, Jul 30, 2010, 11:10 am

Is a single meter reading for a campus acceptable?

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Yong Lee Low on Jul 29, 2010, 11:46 pm

If the project is a 3 building campus,and I split the space types into 6-7 categories but my meter reading is just from a single feeding point i.e. just 1 meter for the entire campus ,will that...

a good thing but not a LEED thing

General forums
posted by Tristan Roberts on Jul 29, 2010, 11:21 am

We recently had a sort-of similar post on the EAp2 forum.
I would agree that you can't earn anything other than a warm fuzzy feeling for this, and...

RE: LEED project boundary in campus setting

General forums
posted by David Posada on Jul 28, 2010, 7:00 pm

Daniel,
It's hard to give you a definitive "yes" or "no" since how you apply the AGMBC to define the LEED boundary depends on whether you're certifying one new building in an existing...

Discrepancy between Reference Manual and Template

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Amy Rider on Jul 26, 2010, 5:25 pm

I am seeing a discrepancy between the LEED template and the IDC reference manual for EAc1.2.
The reference manual for second point (B) states the daylighting must be for 50% of the lighting...

Last reply: Amy Rider, Jul 28, 2010, 4:09 pm