Log in
Forum
Topic

Engineered or laminated wood flooring

Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
posted by Jan Stensland on Nov 3, 2010, 2:30 pm

For LEED for Schools, could an engineered or laminated...

Last reply: Tristan Roberts, Nov 12, 2010, 4:08 pm

Template Needed for CS WEp1

CS-2009 WEp1: Water Use Reduction
posted by Craig Sheehy on Nov 3, 2010, 2:00 pm

Does anybody have a blank CS WEp1 template with the correct public lavatory sink flow rate (.5) in the baseline table? I do not have any new CS projects registered but need to evaluate a...

Last reply: Tristan Roberts, Nov 12, 2010, 4:06 pm

Bus Stop Frequency

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Jena Lester on Nov 12, 2010, 1:16 pm

I'm am working on a project that has (2) bus lines that service the site that are both within a 1/4 mile radius. One line has an all day service route scheduled and the other only has rush hour...

Last reply: Tristan Roberts, Nov 12, 2010, 1:44 pm

Option 4 for non residential project 2003 ITE study

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Florian Schmidtchen on Nov 7, 2010, 11:05 pm

I am working on a production facility located in China with no local zoning requirements regarding the parking capacity.
I am wondering if we could go for option 4 by providing 25% less...

Last reply: Tristan Roberts, Nov 12, 2010, 12:12 pm

out buildings and LEED

General forums
posted by Tristan Roberts on Nov 11, 2010, 9:32 pm

Sean, since these are in your LEED boundary they should be considered for all relevant LEED credits—which will be most of them. Since they're small and unoccupied, I don't think you need to...

Last reply: Cara Mae Cirignano, Nov 12, 2010, 12:11 pm

Campus Recycling

Schools-2009 MRp1: Storage and Collection of Recyclables
posted by Tim Hoeft on Nov 9, 2010, 9:16 am

Our project is on a community college campus that has a dedicated recycling area for the campus that is not within our LEED project area. Is it acceptable to reference this area in the narrative...

Last reply: Tristan Roberts, Nov 12, 2010, 11:54 am

Guest room in Hotels

EBOM-2009 IEQc2.4: Daylight and Views
posted by Ashu Gupta on Jun 11, 2010, 12:57 am

In our hotel project the workspace of all permanent employees is in basement which does not meet the requirement of this credit. but if we include the guest rooms which having the more window...

Last reply: Tristan Roberts, Nov 12, 2010, 11:49 am

Credit Template for SS4.4

CS-2009 SSc4.4: Alternative transportation - parking capacity
posted by Francis Porter on Nov 4, 2010, 7:48 am

I am pursuing this credit through Case 1 Option 1 for a Core and Shell project.

There seems to be a problem with the credit template, as the template is directing my project to select the...

Last reply: Tristan Roberts, Nov 12, 2010, 11:43 am

Annual electric consumption of process equipment

NC-2009 EAc1: Optimize Energy Performance
posted by Maya Karkour on Nov 9, 2010, 8:35 am

Hi there,

Our project is a shopping mall which will include process loads such escalators, lifts and IT equipments. The total demand load (KW) for these systems is easy to get from the...

Last reply: Marcus Sheffer, Nov 12, 2010, 10:07 am

Combine smoking room exhaust with restroom exhaust

CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Ralf Lehmann on Nov 4, 2010, 10:25 am

Sometimes it seams to be easier to combine the air duct system of the exhaust system of a restroom to that of a smoking room. In my oppinion there is no problem to match the requirement on the...

Last reply: Ralf Lehmann, Nov 12, 2010, 9:54 am