Log in
Forum
Topic

Use of clerestories for IEQc8.1?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Karen Stewart on Feb 24, 2011, 12:25 pm

After review of the requirements for IEQc8.1, it appears to me that light from clerestories is not allowed in the calculations for this credit. Am I missing something?

Last reply: Eddy Santosa, Feb 24, 2011, 10:16 pm

Daylighting Simulation Software

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Erin Reome on Jan 20, 2011, 6:27 pm

I'm looking for a revit plugin to run daylight simulations that can be submitted for LEED 2009. Has anyone found great software (ideally a free download) that can run LEED compliant simulations...

Last reply: Eddy Santosa, Feb 24, 2011, 9:50 pm

Tenant Sub-metering Question

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Lorey Flick on Feb 10, 2011, 10:26 am

What is a typical "centrally monitored" system? I have a core and...

Last reply: Gordon Shymko, Feb 24, 2011, 7:40 pm

Restroom ventilation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Alexia Anastassiadis on Feb 1, 2011, 10:21 pm

We are working on a major renovation project and the restrooms have natural ventilation. Do we have to provide additional mechanical exhaust to comply with ASHRAE? Will having natural ventilation...

Last reply: David Hubka, Feb 24, 2011, 4:04 pm

Industrial Plant Manufacturing Hall Ventilation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Sustainability Provider on Feb 3, 2011, 12:08 pm

We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices. (They are directly...

Last reply: David Hubka, Feb 24, 2011, 3:54 pm

Clarification on Minimum Daily Transit Service

Pilot-Credits PC12: Reduced Automobile Dependence
posted by Colin Inderwish on Feb 16, 2011, 12:50 pm

We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different...

Last reply: Fred Dock, Feb 24, 2011, 3:20 pm

online form

NC-2009 MRc2: Construction Waste Management
posted by Rick Vayo on Feb 14, 2011, 11:03 pm

Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong.

...

Last reply: Valerie Walsh, Feb 24, 2011, 2:48 pm

minimum area of neighborhood required?

NC-2009 SSc2: Development Density and Community Connectivity
posted by Pete Larsen on May 26, 2010, 3:30 pm

The credit requires the site to be within 1/2 mile of a neighborhood with minimum 10 units per acre. Is there a minimum area of neighborhood required? For example, does 10% (or any particular...

Last reply: Larry Jones, Feb 24, 2011, 1:50 pm

LEED-ND vs. LEED-NC why would I choose to follow one and not the

LEED Rating System Selection
posted by Andrew Slusser on Feb 22, 2011, 11:50 am

Hi Everyone,

I am looking for some help if anyone has looked at the 2 rating
systems side by side. I am working with a company that is looking at
either certifying buildings...

Last reply: Allison Beer McKenzie, Feb 24, 2011, 1:20 pm

Unit Clarification

CI-2009 SSc2: Development Density and Community Connectivity
posted by Heather Eberhardt on Dec 6, 2010, 1:47 pm

I wanted to know if anyone could tell me how many units you need in a half a mile radius. I am a little confused on how to calculate the 10 units per acre.

Last reply: Larry Jones, Feb 24, 2011, 12:19 pm