Topic | Recent |
---|---|
LEED Online Templates (BETA vs. Version3)Schools-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Feb 23, 2011, 2:15 pm
Dear all, I am currently filling the LEED Online Letter templates. Some of these are BETA version. Until now, I am having no problems/bugs. It it possible that the USGBC asks to... Last reply: Tristan Roberts, Feb 25, 2011, 1:15 pm |
|
Patio doors and Natural VentilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Steve Loppnow on Feb 25, 2011, 11:15 am
Could a sliding patio door contribute to the total operable wall area in a naturally ventilated space, or is it windows only? (per ASHRAE 62.1-2007 paragraph 5.1) Last reply: David Hubka, Feb 25, 2011, 11:51 am |
|
LEED APCI-2009 IDc2: LEED Accredited Professionalposted by Michelle Bracewell-Musson on Feb 25, 2011, 11:07 am
I understand that I need to upload somewhere. Do I do it on the... Last reply: Tristan Roberts, Feb 25, 2011, 11:26 am |
|
LEED APCI-2009 IDc2: LEED Accredited Professionalposted by Michelle Bracewell-Musson on Feb 25, 2011, 10:41 am
While researching the Team Members for LEED AP certification, I noticed under mine (I am a LEED AP) that it said my certificate was not uploaded and that I was not an AP. How do I update this?... Last reply: Tristan Roberts, Feb 25, 2011, 10:49 am |
|
Digital signature / initialsNC-2009 EAp2: Minimum Energy Performanceposted by Nicolas Galiotto on Sep 6, 2010, 9:48 am
Hi Christopher, hi all, A few online forms (EAp2 included) require a digital signature (required signatory) from the owner, the mechanical amd electrical engineers, etc. Can a LEED... Last reply: David Hubka, Feb 25, 2011, 10:08 am |
|
LEED NC SSp1 Is Esc always required? All phases?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Joseph Greco on Feb 15, 2011, 7:42 pm
We are working on a phased construction project for the (major) renovation of a small single-story City owned recreation center (+/- 1200 sf) and associated site improvements. Phase 1 involved... Last reply: Lisa Fabula, Feb 25, 2011, 10:00 am |
|
EAPr2- Lighting Control mandatory in Ashrae standardCI-2009 EAp2: Minimum Energy Performanceposted by Ramesh Narayanan on Feb 25, 2011, 1:51 am
Ashrae 9.4.1 Lighting control states that "Buildings larger than 5000 square feet must have an automatic control device to shut off all lighting in the building. Is this only the tenant space... Last reply: Paul Conrad, Feb 25, 2011, 8:42 am |
|
Printing used for bldg occupants, but outsourcedEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Ted Mendoza on Feb 23, 2011, 3:16 pm
I have a client that has several departments under a building that is being LEED EB-OM certified. One of the departments has a "significant" budget attributed to generating handouts, flyers, etc... Last reply: Ted Mendoza, Feb 25, 2011, 7:46 am |
|
Should I include signs on the facade, when I calculate the LDP?NC-2009 SSc8: Light Pollution Reductionposted by Daniel Strömberg on Feb 25, 2011, 7:43 am
Hi, |
|
How to justify not using the default 25% process energy costNC-2009 EAp2: Minimum Energy Performanceposted by V. Miller on Aug 24, 2010, 5:50 am
I am wondering how we can go about justifying not using the default... Last reply: Tristan Roberts, Feb 25, 2011, 12:28 am |