Log in
Forum
Topic

Confirmation of Case 1 Option 2 and Documentation

CI-2009 SSc3.3: Alternative transportation - parking availability
posted by Raymond Loo on Aug 8, 2011, 12:50 am

To qualify for the 2 credit point here, we would only need to prove that there has been no parking provided or subsidized parking provided to our client (tenant)? For clarity, not tenants of the...

Last reply: Tristan Roberts, Nov 21, 2011, 1:34 am

Where do plumbing fixture uses, by occupancy type, come from?

CI-2009 WEc1: Water Use Reduction
posted by John ONeill on Sep 20, 2011, 2:56 pm

Does anyone know what the basis is for the plumbing fixture uses by occupancy type? For example - 3 water closet uses for each female...

Last reply: Tristan Roberts, Nov 21, 2011, 1:33 am

Electric Vehicle Charging Stations

CI-2009 SSc3.3: Alternative transportation - parking availability
posted by Susan F. on Jul 20, 2011, 8:45 pm

This project has 224...

Last reply: Tristan Roberts, Nov 21, 2011, 1:31 am

Exterior and Party Walls

CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Shirong Meng on Oct 31, 2011, 5:54 am

The elements of "Exterior and Party Walls" include shell or not? It seems to be exterior walls seperated from outdoor and party walls seperated from other spaces. But in the credit requirements,...

Last reply: Tristan Roberts, Nov 21, 2011, 1:28 am

cutsheets?

CS-2009 MRc6: Certified Wood
posted by Sara Neff on Jun 3, 2011, 7:33 pm

I'm confused on whether or not we need to provide product cutsheets, or if the invoices (line item, with dollar values and the...

Last reply: Tristan Roberts, Nov 21, 2011, 1:15 am

HVAC System

CS-2009 EAc4: Enhanced Refrigerant Management
posted by Yolanda Sanchez on Jul 11, 2011, 1:41 pm

HVAC for the whole building is in the process of being designed (VRF system). We would like to know if the system can be installed in 2 stages, but we would like to submit the LEED certification...

Last reply: Tristan Roberts, Nov 21, 2011, 1:12 am

Developer Owned On-Site Renewable Energy Sold to Tenants

CS-2009 EAc2: On-Site Renewable Energy
posted by Mark Frey on Jun 1, 2011, 11:14 am

We are working on a LEED CS project where the investor will sell the energy produced on-site by photovoltaic systems to the tenants in the project building, according to internal fees at a...

Last reply: Tristan Roberts, Nov 21, 2011, 1:10 am

vestibule instead of pressure difference

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Nándor Kovács on Aug 1, 2011, 4:30 am

I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases.

Is it...

Last reply: Tristan Roberts, Nov 21, 2011, 1:05 am

Residential HVAC included in commissioning scope of LEED CS?

CS-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jorng-ren Chern on Oct 25, 2011, 6:22 am

I am working on a condominium project which is planning to certify LEED CS.
The residential units will be sold to buyers when the construction is complete.

The project owner will...

Last reply: Tristan Roberts, Nov 21, 2011, 12:22 am

Rainwater for irrigation

CS-2009 WEc2: Innovative Wastewater Technologies
posted by Juan Robles on Jul 14, 2011, 6:17 pm

We are collecting rainwater and using it for maintenance in the common areas. At the same time, we are achieving a 62% potable water use reduction installing low flush fixtures. Does the...

Last reply: Tristan Roberts, Nov 21, 2011, 12:20 am