Green Label Plus, FloorScore and Option 2CI-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by DOUG VAN ETTEN on Apr 27, 2010, 12:18 pm
Are you able to clarify the meaning of Option 2 and its relation to the footnotes in the credit guide? - Option 2 prescribes compliance with the "requirements of the California... Last reply: Tristan Roberts, Apr 28, 2010, 4:27 pm |
|
IOc1 Exemplary Performance, multiple EP points for EAc4EBOM-2009 IOc1: Innovation in Operationsposted by Ryan Schwabenbauer on Apr 28, 2010, 2:06 pm
Could you achieve multiple Exemplary Performance Points by exceeding a credit by multiple thresholds? Or can you achieve only one EP point per existing credit? Example: LEED... Last reply: Tristan Roberts, Apr 28, 2010, 3:09 pm |
|
LEED Online credit form says toNC-2009 WEp1: Water Use Reductionposted by Armen Khachikyan on Apr 28, 2010, 7:24 am
The LEED Online credit form says to "provide the plumbing fixture and fitting schedule for the project highlighting flush and flow rates for all applicable plumbing fixtures and fittings". What... Last reply: Dave Intner, Apr 28, 2010, 11:43 am |
|
Core fixtures included?CI-2009 WEp1: Water Use Reductionposted by Jonathan Gritz on Sep 5, 2009, 11:00 am
I'd like to hear other people's opinions on this direction included above: Last reply: Devon Bertram, Apr 28, 2010, 1:06 am |
|
Artificial TurfNC-2009 SSc7.1: Heat island effect - nonroofposted by Alexis Voeltner on Apr 27, 2010, 7:25 pm
There are many artificial turf manufacturers that claim their artificial turf satisfy multiple LEED credits. Can artificial turf be considered “open-grid pavement system” under credit SS 7.1:... Last reply: Tristan Roberts, Apr 27, 2010, 8:13 pm |
|
Water info?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Rachael McClain on Apr 27, 2010, 2:43 pm
Hi, I was wondering if you need water bills to generate a Energy Star Rating. The Reference guide says "The energy data must include data from electricity, natural gas, fuel oil, diesel fuel,... Last reply: Corinna Kester, Apr 27, 2010, 2:48 pm |
|
C&S IEQ Credit 3.1CS-2009 IEQc3: Construction IAQ management plan - during constructionposted by Maya Karkour on Apr 27, 2010, 7:09 am
Does the C&S IEQ Credit 3.1 (... Last reply: Tristan Roberts, Apr 27, 2010, 8:57 am |
|
SSc3 Brownfield Lead PaintNC-2009 SSc3: Brownfield Redevelopmentposted by Richard Reed on Apr 14, 2010, 2:05 am
What is the threshold for current lead paint contamination in an existing building to qualify under this credit. There was also previous asbestos remediation approx same sq ft as bldg footprint... Last reply: Richard Reed, Apr 26, 2010, 7:19 pm |
|
How to determine the 90% of the average annual rainfallCS-2009 SSc6.2: Stormwater design - quality controlposted by Hansong Sun on Apr 20, 2010, 6:07 am
Hello Last reply: Hansong Sun, Apr 26, 2010, 5:27 am |
|
Any luck on the circulationGeneral forumsposted by Sarah Johnson on Apr 20, 2010, 2:42 pm
Any luck on the circulation space question? I'm running into this same problem right now. Perhaps these would only include exit passageways or other areas that must only be used for circulation... Last reply: Tristan Roberts, Apr 24, 2010, 2:31 am |