Minimum Thresholds for Landscape CreditsLEED for Homes (LEED-H) Forumposted by Sam Watters on Feb 1, 2012, 2:18 pm
My project is pursuing LEED for Homes: Multifamily Midrise, and I'm, wondering if it has enough landscaped area to qualify for some of the water efficiency and other landscaping credits. ... Last reply: Tristan Roberts, Feb 17, 2012, 10:55 am |
|
EQc6.2 and EAc1.3 for Zoning and ControlsCI-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Megan Snyder on May 18, 2011, 7:18 pm
Is it possible to achieve these simultaneously? One appears to require manual control and the other, auto control. Last reply: Lauren Sparandara, Feb 17, 2012, 10:50 am |
|
Additional space during the final design appealLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Katherine Ann Resurreccion on Feb 15, 2012, 12:28 am
Our CI project is a 4-floor office space located in a 10-floor commercial building. We used the split-review option and are currently working with the Final Design Appeal. Recently, the owner... Last reply: Tristan Roberts, Feb 17, 2012, 2:30 am |
|
Check LEED's Minimum Program RequirementsGeneral forumsposted by Tristan Roberts on Apr 5, 2010, 3:17 pm
Tony, I think the place you need to start to answer this set of questions for your project is with LEED's Minimum Program Requirements. We have... Last reply: Tristan Roberts, Feb 17, 2012, 1:47 am |
|
PIf4 Interior Renderings/DrawingsGeneral forumsposted by David Menk on Feb 9, 2012, 11:34 am
For the requirement of uploading interior renderings or drawings during the design phase -- what kind of drawings are acceptable? Must they be 3d renderings or are interior elevations acceptable... Last reply: Tristan Roberts, Feb 17, 2012, 1:18 am |
|
How to use AGMBC 2005Calculating FTEsposted by Sanghong Han on Dec 19, 2011, 2:17 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up February 17, 2012- 1:13 am Sanghong, sorry for the delayed reply. Please refer to our AGMBC forum for more information and as another place to post. However, buildings are not awarded LEED certification as a group, unless you are pursuing LEED-ND. The certifications are individual. and the AGMBC gives you guidance on navigating campus issues. Log in or register to post comments ... Last reply: Tristan Roberts, Feb 17, 2012, 1:13 am |
|
contact GBCIGeneral forumsposted by Tristan Roberts on Feb 17, 2012, 12:54 am
Nicolas, if you contact... |
|
Option 2 Path 4 Heat island Effect nonroofCI-2009 SSc1: Site Selectionposted by Sue Barnett on Jan 30, 2012, 6:38 pm
so my CI LEED project boundary is half of one floor of an 8 story building, it's 14,000 square feet, and does include an exterior courtyard. I interpreted this SS1 credit to mean the conditions... Last reply: Susann Geithner, Feb 16, 2012, 6:36 pm |
|
MERV 13EBOM-2009 IEQc1.4: Indoor air quality best management practices - reduce particulates in air distributionposted by susan eguia on Feb 17, 2011, 12:05 pm
Our building has existing... Last reply: Manny Iglesia, Feb 16, 2012, 6:26 pm |
|
Evapotranspiration rateCS-2009 WEc1: Water Efficient Landscapingposted by Mike D on Feb 10, 2012, 9:56 am
What should the... Last reply: Susann Geithner, Feb 16, 2012, 6:00 pm |