Topic | Recent |
---|---|
Option 2- RECs purchasingCI-2009 EAc4: Green Powerposted by Juliana Malho on Mar 7, 2012, 2:56 pm
I´m trying to set how many RECs I must buy to comply with this credit for a project of 59,545sqf. According to Reference Guide I should multiply this area by 8kWh for 2 years (59,545 x 8 x 2),... Last reply: Srimannarayana NCVK, Mar 19, 2012, 3:06 am |
|
Integrative Process CreditGeneral forumsposted by Melissa Wrolstad on Mar 16, 2012, 5:20 pm
For BD+C: Last reply: Nadav Malin, Mar 18, 2012, 7:56 pm |
|
LEED 2012v3 still conflates performance and transparencyGeneral forumsposted by Jason Grant on Mar 3, 2012, 11:43 am
While this version of the MR credits is an improvement over the second draft, it does not go far enough in separating out and balancing rewards for performance and transparency. The big problem... Last reply: Jason Grant, Mar 18, 2012, 12:51 pm |
|
Site Assessment CreditGeneral forumsposted by Melissa Wrolstad on Mar 16, 2012, 5:54 pm
Since this credit would need to happen before schematic design - doesn't it make sense to combine it with the Integrative Process section? It already overlaps slightly with the Integrative... |
|
Water Based Coatings- Can't count the carrier solvent?NC-2009 MRc5: Regional Materialsposted by Dwayne Fuhlhage on Nov 7, 2011, 5:10 pm
I've been working with a subcontractor regarding the documentation requests for regionally based materials on a Platinum project. As a manufacturer of formulated products, there is not a lot of... Last reply: Suzanne Robinson, Mar 16, 2012, 4:13 pm |
|
City Stormwater FiltrationNC-2009 SSc6.2: Stormwater design - quality controlposted by Joel Cesare on Mar 9, 2012, 3:08 pm
Most of the stormwater runoff on our site will be directed to the city drain intake, which reportedly is equipped with enhanced filtration. Can this be used for... Last reply: Amy Rider, Mar 16, 2012, 4:02 pm |
|
Can title 24-2008 compliance be used in lieu of ASHRAE 90.1-200?CI-2009 EAc1.3: Optimize energy performance - HVACposted by Leticia SooHoo on Mar 12, 2012, 8:27 pmDylan Connelly Mechanical Engineer Integral Group LEEDuser Expert 472 thumbs up March 16, 2012- 2:17 pm Leticia, You can use T24 in California. I assume you are pursing the energy modeling option. Check out the NC EAp2, EAc1 forums. There is a lot of good info there. Log in or register to post comments Leticia SooHoo Architect, Senior Project Manager IA Interior Architects LEEDuser Basic Member 68 thumbs up March 16, 2012- 2:25 pm Thanks Dylan. I know for NC and Core and shell, projects can submit T24 compliance in lieu of ASHRAE 90.1-2007. And yes, most of it is done through energy modeling.... Last reply: Dylan Connelly, Mar 16, 2012, 2:47 pm |
|
Entering "total project space equipment capacity"- LEED formCI-2009 EAc1.3: Optimize energy performance - HVACposted by Seema Pandya on Feb 14, 2012, 11:50 am
In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks... Last reply: Dylan Connelly, Mar 16, 2012, 2:22 pm |
|
IEQp1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Keerthi Ratnayake on Mar 11, 2012, 1:02 am
Hello, Last reply: Dylan Connelly, Mar 16, 2012, 1:49 pm |
|
Open Office Areas- CO2 monitoring?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Norma Lehman on Feb 23, 2011, 10:47 am
Our building includes private offices, open office areas, and meeting rooms. We have provided CO2 sensors for meeting... Last reply: Dylan Connelly, Mar 16, 2012, 1:35 pm |