Log in
Forum
Topic

video overview of proposed LEED 2012 changes

General forums
posted by Tristan Roberts on Mar 22, 2012, 9:42 pm

LEEDuser has uploaded an hour-long video overview of key changes proposed for LEED 2012 for NC and...

PC13 Closed?

Pilot-Credits PC13: Bicycle Network, Storage, and Changing Rooms
posted by Becky Dix on Mar 22, 2012, 4:23 pm

I was hoping to take part in this pilot credit and see that it has closed. Is it possible to submit similar documentation for an ID credit?

Last reply: Samantha Harrell, Mar 22, 2012, 7:38 pm

Secure bicycle racks and secure bicycle storage

CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Caroline Ma on Feb 22, 2012, 6:10 am

Any difference between Secure bicycle racks and secure bicycle storage?
In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage. Can we...

Last reply: David Posada, Mar 22, 2012, 6:52 pm

Wine Coolers

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Sheela I on Mar 22, 2012, 4:43 pm

Do wine coolers qualify for Energy Star?

Last reply: Samantha Harrell, Mar 22, 2012, 6:34 pm

General- LEED 2012

General forums
posted by Pat Thomas on Mar 20, 2012, 6:57 pm

We project 90+% of the credits will cost more to implement in LEED 2012 than the current cost in LEED 2009 and that is not including additional design team fees or LEED documentation. We feel...

Last reply: Pat Thomas, Mar 22, 2012, 3:52 pm

Evolution of LEED- incremental change or sweeping updates?

General forums
posted by Mara Baum on Mar 22, 2012, 2:43 pm

All this discussion has caused me to reflect on past versions of LEED, and the changes that have brought us to where we are now. Having worked on projects in every LEED version focused on new...

No Engineer on Project

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on Dec 13, 2011, 3:24 pm

All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?

Last reply: Rob Hink, Mar 22, 2012, 10:49 am

Steel Joists & Deck

NC-2009 MRc5: Regional Materials
posted by Jeremy Hatfield on Sep 16, 2011, 1:36 pm

I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills. Does the steel mill serve as their extraction/recovery origin or do we have to...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:44 am

Stated Cost

NC-2009 MRc5: Regional Materials
posted by matthew convery on Mar 5, 2012, 6:04 pm

When calculating both the regional material and...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:41 am

Regional Materials- Mileage Info

NC-2009 MRc5: Regional Materials
posted by Mike Maas on Mar 20, 2012, 1:49 pm

What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills...

Last reply: Keith Lindemulder, Mar 22, 2012, 9:38 am