All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Paul Meyer, PE, CEM, CBCP, GBE LEED AP
Director of Commissioning ServicesWSP Flack + Kurtz
19 thumbs up
December 14, 2011 - 5:07 pm
All HVAC mechanical systems were existing. Only the ductwork was installed. There isnt an Engineer for this project is there a way to copmly without the signature
Rob Hink
Principal, LEED FacultyThe Spinnaker Group
68 thumbs up
March 22, 2012 - 10:49 am
We had a similar case and were able to successfully get the credit approved by having the architect sign and provide a narrative explaining there was no engineer on the project. However, you still must provide all the proper documentation and calculations to show compliance.