WEp1 Authentication of the date and scope of plumbing fixtures

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by fareed shariff on Feb 8, 2012, 12:03 pm

I am currently engage with a LEED EB O&M project located in the UK. As part of the WEp 1 requirement we are asked to upload authentictaion document with reference to the date and scope of...

Last reply: Jenny Carney, Mar 29, 2012, 5:56 pm

lease agreement for residential units

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Carolina Vergnano on Mar 29, 2012, 3:55 pm

We are working on a CS muti-unit residential project. There will be infrastructure for residents to use splits in their units. According to the item 5.9 of ASHRAE 62.1-2007 the project has to...

Lg AHU serving multiple floors, perform calcs at zone level?

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by AAME User on Mar 20, 2012, 11:29 am

I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED...

Last reply: AAME User, Mar 29, 2012, 12:19 pm

Project on Military base (or campus)...help

General forums
posted by Justin Sack on Mar 29, 2012, 11:58 am

We have a project on a military base that must achieve LEED Silver and we are off to a rocky start with the recent return of our design credit submission. The project is New Construction (...

Option 2/ Path 2- Square Footage

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dominique Arrieta on Mar 29, 2012, 10:05 am

Our engineer used the net SF for this calculation instead of the gross SF which matches the PI forms. I know this will be a red flag, but does anyone know if this will be acceptable? Will he have...

Last reply: Marcus Sheffer, Mar 29, 2012, 10:31 am

"required" metered systems

NC-2009 EAc5: Measurement and Verification
posted by Florian Schmidtchen on Mar 29, 2012, 5:17 am

On this webpage in EAc5, I read that there are "Commonly metered systems", including lighting , motors, HVAC loads etc. In my case a part of items in this list seem not helpful on the model...

Last reply: Marcus Sheffer, Mar 29, 2012, 10:28 am

Unixes Restrooms with Dual Flush Toilets

CI-2009 WEp1: Water Use Reduction
posted by Michelle Rosenberger on Mar 28, 2012, 1:48 pm

I see some discussion on the NC2009 forum about this issue but no real resolution. We have an office tenant improvement that has installed two unisex restrooms on the second floor to add some...

Last reply: Michelle Rosenberger, Mar 28, 2012, 6:52 pm

FSC- Value of Wood

NC-2009 MRc7: Certified Wood
posted by matthew convery on Mar 21, 2012, 11:10 am

I have a major window supplier that is providing us...

Last reply: Doug Pierce, AIA, Mar 28, 2012, 6:24 pm

Carpets and PI Form 5

CS-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Eleni Thomidou on Mar 27, 2012, 5:53 pm

Hi!
In our project there are no carpets in our scope but there might be in the buildouts for tenants spaces. In PI Form5 (for the precertification) the Owner wanted to have a least control...

Last reply: Eleni Thomidou, Mar 28, 2012, 5:03 pm

Air Sealing between demising walls in Mid-rise

LEED for Homes (LEED-H) Forum
posted by Ian Johnson on Mar 28, 2012, 4:33 pm

We have a project where the the demising walls go all the way to the underside of the floor trusses and the ceiling drywall is attached to the bottom chord of the floor trusses. The structural...